Epping Ongar Railway

Epping Ongar Railway
Ongar station, opened by the GER in 1865, was served by the London Underground between 1949 and 1994 despite being in rural Essex.
Locale Essex
Services extend only as far as Stonards Hill, although it is planned to extend the line to a new station at Epping.
Commercial operations
Original gauge 4 ft 8 12 in (1,435 mm) standard gauge
Preserved operations
Owned by Epping Ongar Railway Ltd.
Stations 2
Length 6 12 miles (10.5 km) Single track throughout except a passing loop at North Weald
Preserved gauge 4 ft 8 12 in (1,435 mm) standard gauge
Commercial history
Opened 1865
Closed 1994
Preservation history
2004 Re-opened and taken over for Preservation
2007 Closed
2012 Re-opened

Epping Ongar Railway

Legend
Ongar
Blake Hall
North Weald North Weald Airfield

Epping Forest
Central Line
to Ongar closed 1994
Epping London Underground
Central Line
A tube style map

The Epping Ongar Railway is a heritage railway run by a small number of paid staff and team of volunteers in south-west Essex, England. It was the final section of the Great Eastern Railway branch line, later the London Underground's Central line from Loughton via Epping to Ongar, with intermediate stations at North Weald and Blake Hall. The line was closed by London Underground in 1994 and sold in 1998. It reopened between 2004 and 2007 as a preserved railway offering a volunteer-run Class 117 DMU service between Ongar and Coopersale. A change of ownership in 2007 led to the line being closed for restoration to a heritage steam railway, which reopened on 25 May 2012.

Early workings

The line to Ongar was opened in 1865 by the Great Eastern Railway, as an extension to its line from Stratford to Loughton opened in 1856 by its predecessor, the Eastern Counties Railway. The extension was single-track, but whereas the Loughton to Epping section was doubled in the 1890s, the section between Epping and Ongar was always single, apart from a passing loop at North Weald on opening. The eastern end of the loop was severed in 1888, converting it into a siding. Approximately 14 trains each day went to Ongar, with the rest terminating at Loughton or Epping.

This remained the case until 1949,[1] when the London Passenger Transport Board's New Works scheme extended the Central line to Epping using electric trains, taking over the railway from British Railways. The Epping-Ongar branch lost its through trains to London, and a shuttle service between Epping (to connect with trains to London) and Ongar was implemented; for eight years, there was the unusual sight of steam trains and London Underground electric multiple units side-by-side at Epping.[2] The steam shuttle was hired by London Transport from British Railways, as it was felt there was no justification for electrification to Ongar unless patronage of the branch rose. Upon taking over the branch in 1949, London Transport re-converted the siding at North Weald into a passing loop and built a second platform to serve a new westbound track.

In the 1950s, there were attempts to improve the service on the branch, and electrification took place in 1957.[3] The low-cost nature of the electrification meant that although the branch could support eight-car trains as far as North Weald, a maximum of four cars could run to Ongar. The voltage drop along the end-fed line was too great to support full-length trains,[4] and the short platforms were not long enough to support eight-car trains. Hence the Epping to Ongar branch was normally operated as an isolated extension of the Central line, with a few through workings south to Loughton. However, for two days every year through trains were run from London, terminating at North Weald for the North Weald airshow, on the Saturday and Sunday of its opening at the aerodrome almost adjacent to the station. The normal Epping to Ongar shuttle dovetailed with this service, passing the terminating trains on the adjacent line during its westbound journey. The through trains were operated as extra trains on the normal weekend Central line timetables, only four cars long due to the restricted platform length at North Weald.

Cutbacks and closure

The little-used Blake Hall station, rumoured to enjoy just six customers a day in its last days, was closed in 1981 and converted into a private residence.

From the late 1960s, it became clear that the line's patronage was not growing as had been expected, mainly due to restriction of development in what was now designated Metropolitan Green Belt land. Even at its peak in 1971, the 650 passengers daily hardly made the line an economic proposition.[4] London Underground tried to close the entire line in 1980;[5] instead, a reduced service was implemented, along with Blake Hall tube station being closed on Sundays.

North Weald's platform one was closed in 1976, then the passing loop/westbound track was lifted in 1978.[6] Until this time, the station was controlled from the original Eastern Counties Railway signal box, still sited on the southbound platform, now fully restored. North Weald was the last section of the London Underground to be signalled with mechanical semaphore signals.[7]

Blake Hall was closed in 1981;[8] it is said that it handled six customers a day.[9] The station building still survives, without platform, as a private dwelling.[8] Even after closure, it only required a kind word to the shuttle's driver for an unscheduled stop to be made. London Transport responded by removing the platform, rendering the unauthorised procedure impossible.[7]

On 30 September 1994 the line was closed: it was making a loss of seven pounds for each passenger journey and was in need of some expensive maintenance work.[4][10] At the time of closure the line was carrying a mere 80 passengers a day;[4][11] local lore had it that the line was being kept open in case the Cabinet needed to be evacuated to the Kelvedon Hatch Secret Nuclear Bunker at Doddinghurst.[11] The track was left intact along with the stations (albeit not maintained).

The last train, a three-car unit of 1960 stock, has been preserved by Cravens Heritage Trains.[12][13]

Purchase and reopening

The line was purchased by Pilot Developments (later Epping Ongar Railway Ltd) in 1998.[14] The Ongar Railway Preservation Society entered a £325,000 offer for the line, but Pilot Developments convinced London Underground to accept its slightly higher offer after the bidding deadline.[15] Independent politician Martin Bell described the deal as "the most controversial land deal in the constituency for years", alleging a conflict of interest with local politicians.[14] The line was reopened by the Epping Ongar Railway Volunteer Society on Sunday 10 October 2004, providing an hourly service between Ongar and North Weald. The line was shortly after extended to Coopersale, although there are no boarding or alighting facilities there.

Between 22 January and 9 April 2006 the line was shut down for engineering works. This involved general station maintenance, rolling stock maintenance and track maintenance. Ongar station remained closed for engineering works and general maintenance and reopened on 28 May 2006 without the use of the station buildings.

On Easter weekend 2007, the railway had the most visitors on a single day since reopening, on the Sunday and Monday. The Teddy Bears' Picnic, Anniversary of Reopening and Halloween events are also popular.

At the end of 2007, as a result of the awarding of planning permission for the Ongar residential development, the railway was sold to a new private owner who was committed to bring steam back to the line.

Following the change of ownership in 2007,[16][17] it was decided to suspend train operations and to concentrate on improving the track. This was done in order to undertake the major engineering works to secure its long-term future and facilitate the return of steam to the line, this included; restoration of station buildings, run-round loops, full signalling and coal and water facilities. There have been major changes to the Ongar and North Weald stations.

Ongar

The Good Yards area (derelict since the 1960s) has been purchased by David Wilson Homes, which has built a small collection of houses. The Cattle Dock remains, as does the main station building, which has been repainted in GER colours (1900–1930s). Ongar is the only operational GER station in GER colours.

The milk dock is being restored into a bay platform, which will become Platform 2. Shop facilities are in the main building. No refreshment facilities are available.

All the track has been lowered to accommodate B.R. mainline rolling stock, and a new signalbox has been installed on the end of platform 2 in the style of the original, this incorporates the original signal frame which was saved when the original box was demolished. Most of the points and signals are now connected to this.

North Weald

North Weald has been repainted in LNER/BR (E) (1940s–1960s) colours, Brunswick green and cream.

The track height has been lowered to accommodate UK standard stock and has been relaid through the loop and into the bay platform, making three operational platforms, the new signalling allows bi-directional working, access to improved siding facilities and to enable safer shunting.

Epping Forest

The rail service has been extended from Coopersale to within a few hundred metres of the London Underground station.[18] It is impossible to alight at Epping, but the EOR intends to build a platform at the site.[19]

Resumption of passenger services

In March 2012 Epping Ongar Railway announced a resumption of services from 25 May 2012, coinciding with the 150th year since the Great Eastern Railway was formed.[20] On the weekend starting 25 May the railway operated a special service. It now runs train services every weekend and bank holiday in the summer; during the Olympics in July–August 2012 at nearby Stratford, the line operated daily.

EOR runs steam and diesel-hauled trains between Ongar and North Weald, a diesel shuttle from North Weald to Coopersale Lane, and heritage bus services connecting with surrounding towns and the Central line at Epping.[20]

Heritage railway operations

During 2004-07 the line ran an hourly service on Sundays and Bank Holidays, on the hour from Ongar, arriving at North Weald at 13 minutes past the hour before departing for Coopersale, and returning to North Weald at 33 minutes past the hour, then leaving for Ongar. The first train left Ongar at 11:00, with the last returning at 15:50 (16:50 between April and September).

Since re-opening in 2012 there have been trains on Saturdays, Sundays, Bank Holidays and some school holiday weekdays. The summer timetable has trains until approximately 17:30, though from late October the last trains run at around 15:30.

Current rolling stock

Reference:[21]

Plans of the EOR

References

  1. Institution of Civil Engineers (1987). Moving people in tomorrow's world. Thomas Telford. p. 42. ISBN 0-7277-0391-9.
  2. Taylor, Sheila; Green, Oliver (2002). The Moving Metropolis: A History of London's Transport Since 1800. Lawrence King. p. 281. ISBN 1-85669-241-8.
  3. Taylor & Green 2002, p. 281.
  4. 1 2 3 4 Bowen, David (1995-07-09). "There's life in the old track yet". The Independent (London). Retrieved 2007-09-30.
  5. "Blake Hall poster advertising proposed closure". Retrieved 2008-07-17.
  6. The Holden F5 Trust. "The Railway to Epping & Ongar". Retrieved 2007-09-29.
  7. 1 2 Epping Ongar Railway Ltd.
  8. 1 2 Catford, Nick. "Subterranea Britannica: SB-Sites: Blake Hall Station". Subterranea Britannica. Retrieved 2007-09-29.
  9. "Epping to Ongar railway line, Essex". urban75. Retrieved 2007-09-29.
  10. Cravens Heritage Trains. "Railways to Epping and Ongar". Retrieved 2007-09-30.
  11. 1 2 Martin, Andrew (30 March 2003). "London Lives: Twopenny Tube". The Independent on Sunday. Archived from the original on 20 June 2008. Retrieved 2007-09-30.
  12. Cravens Heritage Trains. "Cravens Heritage Trains: 1960 Train Stock". Retrieved 2007-09-30.
  13. "Cravens Heritage Trains". District Dave's London Underground Site.
  14. 1 2 "Brentwood: Candidates in rail row". Clacton and Frinton Gazette. 2001-05-23. Retrieved 2007-09-30.
  15. Lawhor, Anna (2004-02-17). "Train line could be back on track". Ongar Guardian. Retrieved 2007-09-30.
  16. "Heritage railway line is on track for grand reopening". Brentwood Gazette. 20 May 2011. Retrieved 15 June 2014.
  17. "Great Western Pair for Epping Ongar Railway". rail.co.uk. 2012. Retrieved 15 June 2014.
  18. http://www.brentwoodgazette.co.uk/Heritage-line-extended-100m-Tube/story-26330101-detail/story.html
  19. http://eorailway.co.uk/your-visit/along-the-branch/
  20. 1 2 "EOR Announces the Resumption of Passenger Services". Epping Ongar Railway. Retrieved 31 March 2012.
  21. http://eorailway.co.uk/departments/rollingstock/
Wikimedia Commons has media related to Epping Ongar Railway.

Coordinates: 51°42′40″N 0°11′06″E / 51.71108°N 0.18505°E / 51.71108; 0.18505

This article is issued from Wikipedia - version of the 11/25/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.