Teignmouth railway station

Teignmouth National Rail
Location
Place Teignmouth, Devon
Local authority Teignbridge
Coordinates 50°32′53″N 3°29′40″W / 50.54814°N 3.49452°W / 50.54814; -3.49452Coordinates: 50°32′53″N 3°29′40″W / 50.54814°N 3.49452°W / 50.54814; -3.49452
Grid reference SX942731
Operations
Station code TGM
Managed by Great Western Railway
Number of platforms 2
DfT category D
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2002/03   0.286 million
2004/05 Increase 0.319 million
2005/06 Increase 0.331 million
2006/07 Increase 0.365 million
2007/08 Increase 0.418 million
2008/09 Increase 0.438 million
2009/10 Increase 0.451 million
2010/11 Increase 0.505 million
2011/12 Increase 0.566 million
2012/13 Increase 0.592 million
2013/14 Decrease 0.567 million
2014/15 Increase 0.603[1] million
History
Original company South Devon Railway
Pre-grouping Great Western Railway
Post-grouping Great Western Railway
Opened 1846
Rebuilt 1895
National Rail – UK railway stations
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Teignmouth from Office of Rail and Road statistics. Methodology may vary year on year.
UK Railways portal

Teignmouth railway station is on the Exeter to Plymouth line and serves the town of Teignmouth, Devon, England. It is operated by Great Western Railway.

History

The station was opened by the South Devon Railway Company on 30 May 1846 as the terminus of its first section from Exeter.[2] The line was extended to Newton Abbot on 31 December 1846. The single platform was augmented by a second one late in 1848. At this time it was a 7 ft (2,134 mm) broad gauge railway.

Trains were worked from Exeter by atmospheric power from 13 September 1847 and these were extended to Newton Abbot from 17 December 1847 until all the atmospheric trains were suspended on 9 September 1848.[3] The atmospheric engine house was situated adjacent to the platform on the side furthest from the town, the area then being used as permanent way workshops until about 1876.

The South Devon Railway was amalgamated into the Great Western Railway on 1 February 1876. When first built the station was situated between two tunnels but the West Tunnel was opened out by June 1881 and the Eastcliffe Tunnel leading to the Sea Wall was removed by 1884, when the distinctive lattice girder bridge at the end of the Sea Wall was installed.

The canopy and buildings of 1895 still stand

On 20 May 1892 the line was converted to 4 ft 8 12 in (1,435 mm) standard gauge. The station was completely rebuilt soon after, the work being completed early in 1895. It now had a similar scale of facilities as those found at other big West Country resorts which had new stations during the last quarter of the century, Torquay and Weston-super-Mare. To accommodate longer trains the westbound platform was extended in 1938 and could then handle 15 coach trains, but the opposite platform could not be extended due to the entrance to the goods yard.

The Great Western Railway in turn was nationalised into British Railways on 1 January 1948. General goods traffic at Teignmouth ceased on 14 June 1965 but coal traffic continued to be handled until 4 December 1967.[4] This allowed the extension of the second platform to the length of Inter City trains, although this did not happen until 1981. The signal box, which was built at the west end of the westbound platform in 1896, was closed on 14 November 1986 when the new Panel Signal Box at Exeter took over control of the line.

The station was closed for two months during the repair of the railway and sea wall at Dawlish caused by the great storm of February 2014. The iron work supporting the roof was repainted during this period. Refurbishing of the pedestrian bridge between the platforms commenced in 2016.

Description

The station is situated near the edge of the town centre and a short walk from the beach and South West Coast Path.

It is constructed out of dark grey rubble stone. The main entrance and booking office is on the platform used by trains to Paignton. All the main facilities, including a café, are situated on this platform. When the booking office is closed access to the station is through the gates adjacent to the wide footbridge which links the main platform to the one used by trains towards Dawlish and Exeter. It is the second busiest station on the Riviera Line after Newton Abbot.

Services

142009 calls with an Exmouth to Paignton service

Teignmouth is served by Great Western Railway local trains in both directions on an approximately hourly basis during the day - more frequent at peak times. Most trains run between Exmouth and Paignton; on Sundays the service is less frequent and most trains only run between Exeter St Davids and Paignton.[5] A few Great Western Railway trains from Bristol Temple Meads/Cardiff or from London Paddington also call at Teignmouth[5] as do CrossCountry services from the North of England.[6] Most of these services, including the Torbay Express from Paddington, continue to Paignton but a few run instead to Plymouth and even Penzance. At other times passengers travelling east or north catch a local train and change into main line trains at Exeter St Davids, or at Newton Abbot if travelling westwards.

Preceding station National Rail Following station
Dawlish   Great Western Railway
Riviera Line
  Newton Abbot
  CrossCountry
Cornwall-Scotland
 

References

Wikimedia Commons has media related to Teignmouth railway station.
  1. http://orr.gov.uk/statistics/published-stats/station-usage-estimates
  2. Gregory, R H (1982). The South Devon Railway. Salisbury: Oakwood Press. ISBN 0-85361-286-2.
  3. Kay, Peter (1991). Exeter - Newton Abbot: A Railway History. Sheffield: Platform 5 Publishing. ISBN 1-872524-42-7.
  4. Oakley, Mike (2007). Devon Railway Stations. Wimbourne: The Dovecote Press. ISBN 978-1-904349-55-6.
  5. 1 2 Table 135 National Rail timetable, May 2016
  6. Table 51 National Rail timetable, May 2016

Further reading

This station offers access to the South West Coast Path
Distance to path 0.25 miles (0.40 km)
Next station anticlockwise Dawlish 3 miles (5 km)
Next station clockwise Torquay 11 miles (18 km)
This article is issued from Wikipedia - version of the 9/2/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.