Petit train d'Artouste

Petit train d'Artouste

The train on route
Overview
Type Light railway
Status Operational
Locale Laruns, Pyrénées-Atlantiques, France
Termini Ossau2000
Lac d'Artouste
Technical
Line length 10 km (6.2 mi)
Number of tracks Single track
Track gauge 500 mm (19 34 in)
Operating speed 15 km/h (9.3 mph)

The Petit train d'Artouste is a narrow gauge tourist railway situated in the French Pyrenees close to the Spanish border, some 55 km (34.2 mi) south of the town of Pau, and within the commune of Laruns. The line runs high above the headwaters of the Gave d'Ossau, and provides access to the Lac d'Artouste, a semi-artificial lake in the mountains at an altitude of over 2,000 m (6,562 ft).[1]

The line was originally constructed for the Compagnie des Chemins de Fer du Midi (CFM), the then main line railway operator in the area to the north of the Pyrenees. As part of a program of electrifying these lines, the CFM constructed a series of hydro-electric power stations in the valley of the Ossau between the years 1920 and 1932. Significant civil engineering works were required in order to provide access to these works, and included the line now used by the petit train. Once this work was finished, the CFM recognised the tourist potential of the line, and the first tourist trains were run.[1][2]

Today the petit train is reached by a télécabine from a lower station at Artouste-Fabrèges, on the Lac de Fabrèges in the valley of the Gave du Brousset. This lower station is at an altitude of 1,240 m (4,068 ft) and accessible by road. The télécabine climbs to an upper station (known as Ossau2000) at an altitude of 1,920 m (6,299 ft), where passengers change to the petit train. After leaving Ossau2000, the line runs through a 315 m (1,033 ft) tunnel, crossing under the ridge to reach a point high above the valley of the Gave de Soussouéou, another of the Gave d'Ossau's tributaries. From here the line runs along a twisting and vertiginous ledge above that valley until it reaches the dam of the Lac d'Artouste.[1] The culminating point of the railway is approximately 1,940 m.[3]

The line is 10 km (6.2 mi) long and is built to a gauge of 500 mm (19 34 in). Trains consist of 6 12-seat carriages pulled by a diesel locomotive, and operate from late May or early July until the end of September or early October. They are subject to a maximum speed of 15 km/h (9.3 mph) and the end to end journey takes just under one hour. On busy days, up to 10 trains are used providing 3 departures per hour, whilst at other times departures are hourly. Trains depart from 08.30 until 14:30 or later in the high season.[1][4]

References

  1. 1 2 3 4 Bent, Mike; Leleu, Thierry (August 2008). "Artouste - a metro in the Pyrenees". Today's Railways. Platform 5 Publishing Ltd. pp. 36–41.
  2. "Historique". Le Petit train d'Artouste. Retrieved 2008-08-06.
  3. Retrieved from the IGN topographic maps
  4. "Informations utiles". Le Petit train d'Artouste. Retrieved 2008-08-07.
This article is issued from Wikipedia - version of the 7/18/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.