Málaga Metro

Málaga Metro
Overview
Native name Metro de Málaga
Locale Málaga, Andalusia, Spain
Transit type Rapid transit/Light metro
Number of lines 2[1]
4 (planned)
Number of stations 17[1]
Annual ridership 5 million[2]
Operation
Began operation 30 July 2014[3]
Operator(s) Agencia de Obra Pública de la Junta de Andalucía
Number of vehicles 14 CAF Urbos 3
Technical
System length 11.3 km (7.0 mi)[1]
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Top speed 70 km/h (43 mph)
System map
Map of the Málaga Metro network

The Málaga Metro (Spanish: Metro de Málaga) is a light metro network in Málaga, Spain. Having been proposed during the 1990s to ease the cites crippling congestion, the 'ministry of public works and transport' commissioned a study in 2001 into the feasibility of constructing a metro system within the city. The eventual plan envisioned four lines radiating from the city's center, with stations roughly 500 meters apart to allow a high level of accessibility, funding for the project coming from both the local and national government levels. The system was originally scheduled to open on 31 October 2013.[4] Its two lines finally opened in service on 30 July 2014.[3]

Whilst the original plan called for four lines (of which two have been built) the current plan is for a total of 6 lines to connect the most populated suburbs to the city center.

Map of the fully planned Málaga Metro project

Lines

The following table lists the important characteristics of the metro's two lines:[1]

Line Termini Length Stations Avg. distance
between
stations (m)
El Perchel Andalucía Tech 6.7 km (4.2 mi) 11 595
El Perchel Palacio de los Deportes 4.6 km (2.9 mi) 7 608
Total: 11.3 km (7.0 mi) 17[Note 1]

Route

Both lines of the Málaga Metro run underground in the city centre. Line 1 goes from the city center to the University of Málaga. Between Clínico station and the Andalucía Tech terminus, Line 1 runs at the surface[5] which includes some at-grade intersections.[6]

Line 2 runs entirely underground from the city centre to the Jose Maria Martin Carpena Arena.[5]

Rolling Stock

The trains, called 'Urbos 3' and used for the entire system, are manufactured by the Spanish company Construcciones y Auxiliar de Ferrocarriles. They are fully covered by CCTV and are air conditioned throughout; an effort to provide security and comfort to a full capacity train car of 56 seated passengers with 170 standing. Whilst this capacity figure is accurate for likely peak-time usage, the trains are also fully accessible to disabled passengers, the commuting of whom may lower the capacity slightly.[5]

The trains are already in successful widespread use in other cities, including 30 units on trams in Belgrade and 40 are also planned for the Cuiabá system in Brazil. Malaga's metro however, represents the largest single order of the model.

Notes

  1. Counting the terminal El Perchel transfer station only once.

References

  1. 1 2 3 4 "Líneas y mapas" [Lines and maps] (in Spanish). Metro Málaga. 2014. Retrieved 2014-08-24.
  2. Metro de Málaga. "López anuncia que el Metro de Málaga cumple sus previsiones y transporta 5 millones de usuarios en su primer año" (in Spanish). Retrieved 10 October 2016.
  3. 1 2 Puente, Fernando (30 July 2014). "Malaga light metro network opens". International Railway Journal. Retrieved 2014-07-30.
  4. Costa-news.com. Retrieved 2011-09-26.
  5. 1 2 3 "Viajar en metro paso a paso" [Travel on the metro step by step] (in Spanish). Metro Málaga. 2014. Retrieved 2014-08-24.
  6. "Malaga metro problems - before work's even started". EuroweeklyNews. 27 March 2014. Retrieved 2014-07-30.

Media related to Málaga Metro at Wikimedia Commons

This article is issued from Wikipedia - version of the 12/2/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.