Line 3, Xi'an Metro

Line 3, Xi'an Metro
Overview
Native name 西安地铁三号线
Type Rapid Transit
System Xi'an Metro
Status Operational
Locale Xi'an, Shaanxi, China
Termini Yuhuazhai [1]
Baoshuiqu [1]
Stations 26 [1]
Services 1
Daily ridership N/A
Color on map Purple [2]
Website Xi'an Metro
Operation
Opened November 8th, 2016
Owner Xi'an Metro Ltd
Operator(s) Xi'an Metro Ltd
Character Underground and overground
Depot(s) Yuhuazhai Depot and
Guoji Gangwuqu Depot [1]
Rolling stock CNR DKZ17
Technical
Line length 39.15 km (Phase 1)
50.5 km (After completion of Phase 2)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 1500 V DC Overhead catenary [3]
Operating speed 80 km/h (50 mph)
Route map

Line 3 of Xi'an Metro (Chinese:西安地铁三号线; pinyin:Xī'ān dìtiě sānhàoxiàn) is a rapid transit line running from northeast to southwest Xi'an, linking Xi'an International Trade & Logistics Park in the northwest through Xi'an Economic & Technological Development Zone to Yuhuazhai in the southwest. Line 3 is one of the three lines that form the main framework of Xi'an metro.[1] Phase 1 of Line 3 was opened on November 8th, 2016, with 19 underground stations and 7 overground stations. Phase 2 is still under construction. The line has purple as its color label,[2] as distinct from red of Line 2, and blue of Line 1.

Stations (from south to north)

Station Number Station Name
(Chinese with transliteration)
Station Name

(Unofficial English translation)[nb 1]

Transfer District Phase
301 鱼化寨站
Yuhuazhai Zhan
None Planned Yanta District Phase 1
302丈八北路站

Zhangbabei Lu Zhan

North Zhangba Road Station
303延平门站

Yanpingmen Zhan

Line 8

(due 2021)

304 科技路站

Keji Lu Zhan

Keji Road Station Line 6

(due 2019)

305 太白南路站

Taibai Nanlu Zhan

South Taibai Road Station None Planned
306 吉祥村站

Jixiangcun Zhan

307 小寨站

Xiaozhai Zhan

Line 2
308 大雁塔站

Dayanta Zhan

Giant Wild Goose Pagoda Station Line 4

(due 2018)

309 北池头站

Beichitou Zhan

None Planned
310 青龙寺站

Qinglongsi Zhan

Azure Dragon Temple Station
311 延兴门站

Yanxingmen Zhan

Beilin District
312 咸宁路站

Xianning Lu Zhan

Xianning Road Station Line 6

(due 2019)

Xincheng and

Beilin District

313 长乐公园站

Changle Gongyuan Zhan

Changle Park Station None Planned Xincheng District
314 通化门站

Tonghuamen Zhan

Line 1
315 胡家庙站

Hujiamiao Zhan

None Planned
316 石家街站

Shijiajie Zhan

317 辛家庙站

Xinjiamiao Zhan

Weiyang District
318 广泰门站

Guangtaimen Zhan

Line 8

(due 2021)

319 桃花潭站

Taohuatan Zhan

None Planned Baqiao District
320 浐灞中心站

Chanba Zhongxin Zhan

Chanba Central Station
321 香胡湾站

Xianghuwan Zhan

322 务庄站

Wuzhuang Zhan

323 国际港务区站

Guoji Gangwuqu Zhan

Xi'an International Trade & Logistics Park Station
324 双寨站

Shuangzhai Zhan

325 新筑站

Xinzhu Zhan

326 保税区站

Baoshuiqu Zhan

Tax-free Zone Station

Phase 2

Phase 2 of Xi'an Metro Line 3 is still in long-term planning [1](to be completed by year 2040), it will be an extension from the southwest terminus of Phase 1, Yuhuazhai Station to (tentatively named) Kunmingchi Station. After the completion of Phase 2, Line 3 will have 30 stations (an addition of 4 to Phase 1) and a length of 50.5 km in total.[1]

Rolling Stock

The rolling stock consists solely of CNR DKZ17 trains manufactured by CNR Dalian, 41 trainsets will be provided as per the first contract.[4] The trains run in six-car formation, with four motor cars and two trailer cars, which is different from previous trains (running in 3-3 formation), as more power is required to drive the trains up the ramp from underground to overground sections.[4]

DKZ17
Manufacturer CNR
Built at CNR Dalian, CNR Changchun and CSR Sifang[4]
Formation Six-car formation
Tc-Mp-M-T-Mp-Tc[nb 2]
Capacity 1468(rated) 1880(maximum)
Operator(s) Xi'an Metro
Specifications
Train length 19000 mm
Width 2800 mm
Height 3800 mm
Electric system(s) 1500 V DC Overhead catenary

Train Control

Line 3, as all the previous lines, uses Trainguard MT CBTC signal system manufactured by Siemens[5][6] to enhance the safety of the automated, driverless trains.

Notes

  1. These station names do not have official English translations, instead, pinyin transliterations are used.
  2. Note that trains running on line 3 will be different with 4 motor cars and 2 trailer cars.

References

  1. 1 2 3 4 5 6 7 "西安地铁三号线一期工程" (in Chinese). 26 August 2013.
  2. 1 2 "西安地铁三号线列车线路识别色定为紫色" (in Chinese). 31 January 2015.
  3. "西安地铁三号线高架段供电系统工程正式开工". sn.people.com.cn (in Chinese). 17 March 2015. Retrieved 6 November 2015.
  4. 1 2 3 "西安地铁3号线首批列车到西安 腰线是粉色". 31 August 2015. Retrieved 6 November 2015.
  5. "Trainguard MT" (PDF). mobility.siemens.com. Siemens. p. 11. Retrieved 6 November 2015.
  6. "Communication Based Train Control System for Xi'an Metro Line 2". Baidu Documents. Retrieved 6 November 2015.
This article is issued from Wikipedia - version of the 11/16/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.