Kristall

For other uses, see Kristall (disambiguation).
Kristall Module (Mir)

Kristall in 1997
Module statistics
Mission nameMir
LaunchMay 31, 1990
10:33:20 UTC
LC-200/39, Baikonur Cosmodrome, USSR
Launch vehicleProton-K
DockedJune 10, 1990
10:47:22 UTC
Re-entryMarch 23, 2001
05:50:00 UTC
Time in Orbit3948 days, 19 hours
Length11.9 m
Diameter4.35 m
Mass43,290 lb (19,640 kg)
Wingspan:36 m
Habitable volume:60.8 m3

The Kristall (Russian: Кристалл; English: Crystal) (77KST, TsM-T, 11F77T) module was the fourth module and the third major addition to the Mir space station. As with previous modules, its configuration was based on the 77K (TKS) module, and was originally named "Kvant 3". It was launched on May 31, 1990 on a Proton rocket. It docked to Mir autonomously on June 10, 1990.

Description

Isolated view of Kristall

Kristall had several materials processing furnaces. They were called Krater 5, Optizon 1, Zona 2, and Zona 3. It also had a biotechnology experiment called the Aniur electrophoresis unit. These experiments were capable of generating 100 kg of raw materials for use on Earth. Located in the docking node was the Priroda 5 camera which was used for Earth resources experiments. Kristall also had several astronomy and astrophysics experiments which were designed to augment experiments that were already located in Kvant-1. Kristall's solar panels were also different from others on Mir. They were designed to be "collapsible" which means that they could be deployed and retracted several times. One of Kristall's solar panels was removed and re-deployed on Kvant-1 in 1995. That solar panel was later disposed of in November, 1997. Kristall also carried six gyrodines for attitude control and to augment those already on the station. The control system of Kristall was developed by the JSC "Khartron"[1] (Kharkiv, Ukraine).

List of experiments:

Relation to Buran and Shuttle programs

APAS-89 docking mechanisms on Kristall
Cut-way view of Kristall

The most notable feature of Kristall was its relation to the Soviet Buran program. Kristall carried two APAS-89 Androgynous Peripheral Attach System designed to be compatible with the Buran shuttle. One unit was located axially and the other was located radially. After the cancellation of the Buran program in 1993, the lateral docking port found use for the Shuttle-Mir Program. The radial port was never used. The axial port was tested by the modified Soyuz TM-16 spacecraft in 1993 in preparation for Shuttle dockings. On May 26, 1995, Kristall was moved from the -Y port on the Mir base block to the -X port. It was then moved on May 30 to -Z port in preparation for the arrival of the Spektr module. On June 10, Kristall was moved back to -X port to prepare for the upcoming Shuttle docking. The first Space Shuttle docking occurred in 1995 during STS-71 by the Space Shuttle Atlantis. On July 17, 1995, Kristall was moved one last time to its permanent position at the -Z port. For Buran dockings, the entire procedure of moving Kristall would have to be used.

On STS-74, the next Shuttle docking, Atlantis carried a docking module that was attached to Kristall. This allowed future shuttle dockings to be carried out without the need to move Kristall.

Wikimedia Commons has media related to Kristall.

References

  1. Krivonosov, Khartron: Computers for rocket guidance systems
This article is issued from Wikipedia - version of the 3/11/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.