Drakelands Mine

The Main Opencast

Drakelands Mine – formerly known as Hemerdon Mine, or the Hemerdon Ball or Hemerdon Bal Mine[1] – is a tungsten and tin mine. It is located 11 km (7 miles) northeast of Plymouth, near Plympton, in Devon, England. It lies to the north of the villages of Sparkwell and Hemerdon and adjacent to the large china clay pits near Lee Moor. The mine was out of operation since 1944, except for the brief operation of a trial mine in the 1980s, but work started to re-open it in 2014. It hosts the fourth largest tin-tungsten deposit in the world.[2][3][4]

Geology

The Hemerdon Ball granite is an outlying cupola intrusion surrounded by Devonian slates, known regionally as killas. Fractures in the granite and killas have been penetrated by mineralising fluids containing metallic ores in the area around the mine.[5] Two types of vein are discernible with three different orientations. Quartz and quartz-feldspar veins form a stockwork with minor mineralisation, whilst greisen bordered veins are found in a sheeted vein system with wolframite and minor cassiterite mineralisation.[6]s

The mineralisation begins at surface and extends to depths of at least 400 metres (1,300 ft). The vein system is hosted in a dyke like granite body, extending from the Hemerdon Ball towards the Crownhill Down granite. It is flanked by killas, formed by contact metamorphism, which also contains veins although wolframite and cassiterite is found as a lower percentage of the rock bulk. Kaolinisation occurs to depths of up to 50 metres (160 ft) in the granitic body.[7]

The locality is renowned for its high quality scorodite specimens, which are among the best in Europe. Pharmacosiderite, Cassiterite and Wolframite of specimen quality have also been recovered from the mine. Scorodite and Pharmacosiderite are secondary arsenate minerals, that form in the upper oxidation zones of ore bodies. They are formed from alteration of arsenopyrite, and are found in the weathered zone of the deposit. At depths beneath the existing pit it is likely they will become scarce.[8]

History

1867–1959

Mine buildings
WW2 Mill structures

The Hemerdon tungsten-tin deposit was discovered in 1867.[9] In 1916, due to war associated tungsten shortages, an exploration and development program was initiated, which outlined a tin-tungsten stockwork suitable for opencast extraction. In 1917, Hemerdon Mines Ltd decided to construct a 140,000-tonne per year mill, and shortly afterwards opencast ore mining operations began. The mine was operated in 1918–1919, during which time it processed 16,000 tonnes of ore. When the British government stopped accepting tungsten ores under the war pricing scheme the mine was forced to suspend mining operations.[10]

Several attempts were made to establish a higher and stable price for tungsten from the government, including an application supported by Winston Churchill for recognition of wolfram mining as a key industry.[11] However, after further price decreases, milling operations were suspended and the mill components were sold off.[12] In 1934 increased tungsten prices resulted in renewed prospecting of the deposit, along with metallurgical testwork. In 1939 further shortages of tungsten due to WW2 led to Hemerdon Wolfram Ltd constructing a 90,000-tonne per year mill with 55% wolfram recovery, which began operation in 1941.[13]

The Ministry of Supply carried out extensive evaluation of tungsten deposits in the UK, and it was concluded by 1942 that Hemerdon offered the most potential for producing tungsten on a large scale.[14] The government took over the mine from Hemerdon Wolfram Ltd. A resource of 2.5 million tonnes of 0.14% tungsten trioxide in addition to tin was outlined, and a new plant was hastily constructed.

The new plant took over operation from the old plant in 1943, and theoretically should have been able to treat over 1 million tonnes per year; however labour shortages and mechanical faults resulted in a much lower production. Ore output from a mixture of underground and opencast mining methods was documented as over 200,000 tonnes, with a resulting 180 tonnes of tin/tungsten concentrate during the period of government operation.[15] Operations ceased in June 1944 due to access to overseas supplies being restored.[16]

The plant was kept in place after the war, and the government was rumoured to have planned restarting production during the tungsten shortages associated with the Korean War.[17] However, nothing came of this and following the Westwood Report in 1956, the government decided to seek a private partner to move the mine’s development forwards. After further decreases in the tungsten price, resulting in the closure of the Castle-an-Dinas Mine tungsten mine in Cornwall, the government sold off all the plant in 1959.

1960–2006

However, in the mid-1960s work on the prospect was recommenced by British Tungsten Ltd, owned by Canadian entrepreneur W.A.Richardson. In 1969 a planning application for opencast working of tin, tungsten and china clay was submitted, but it was withdrawn before a decision could be made. Further work commencing in 1970 by British Tungsten Ltd increased the resource to 5.6 million tonnes of ore.[18][19]

The leases were transferred to Hemerdon Mining and Smelting Ltd in 1976. They initiated a drilling program shortly before they entered a joint venture to develop the project with international mining firm AMAX in 1977.[20] An extensive exploration programme costing in excess of $10 million was completed between 1978 and 1980.[21] By the end of 1978, deeper drilling enlarged the resource size to 20 million tonnes of ore. In 1979 this was expanded to 45 million tonnes.[22] At the end of the exploration programme in 1980, over 14,000 metres (46,000 ft) of diamond drilling had been undertaken, outlining a resource of 0.17% tungsten trioxide and 0.025% tin over 49.6 million tonnes.[23]

Bulk sampling of the deposit using an underground drift for ore, and a pilot HMS and Gravity plant for processing, was undertaken in 1980.[24] On average recoveries of around 65% were made, although in excess of 70% was achieved.[23] The final revision of the mining feasibility study concluded in 1982 that a within a global resource of 73 million tonnes of ore, at grades of 0.143% tungsten trioxide and 0.026% tin, there was an in pit reserve of 38 million tonnes, at grades of 0.183% tungsten trioxide and 0.029% tin.[25]

The venture was joined by Billiton Minerals Ltd, providing further finance and expertise, and forming a consortium that planned to commence production in 1986.[26] The initial planning application was made in 1981, but a public enquiry and ‘calling in’ of the application by the Secretary of State resulting in an initial refusing of the application in 1984.[27] This resulted in Billiton Minerals Ltd pulling out of the consortium.[28] Hemerdon Mining and Smelting Ltd also sold their 50% stake in the project to AMAX.[29] After making a revised application, permission was finally obtained in 1986.[9] By then a collapse in both the tin and tungsten prices had damaged the economic feasibility of making an investment in opening the mine. Its tungsten assets were passed onto to a newly formed holding company; Canada Tungsten Ltd, in 1986.[30]

Canada Tungsten implemented the planning permission that was obtained in 1986, and kept the project in its portfolio of prospects for many years. Before AMAX was sold to Phelps Dodge, it gradually transferred Canada Tungsten into the ownership of Aur Resources. In 1997, a new company, North American Tungsten plc, purchased all the tungsten assets from Aur Resources, and was listed with the aim of reopening the Cantung mine, and developing the Hemerdon and Mactung prospects.[31]

However, during a review of peripheral assets in 1999, it decided that with the depressed prices of tungsten, the Hemerdon prospect was not central to its future. With upkeep costs of in excess of C$150,000 per annum, almost a third of the company’s annual costs, attempts were made with the mineral rights holders to reduce fees. The negotiations were unsuccessful and therefore during 2000, two of the three mineral rights were surrendered.[32] To further reduce costs, it disposed the remaining assets of the Hemerdon prospect in 2003.[33]

As an aside, the concrete roads constructed around the second world war mills up to the open cast area at the top of the hill were used by the Plymouth Motor Club and Plymouth Kart Club for speed hill climbs until approximately 1972.

Another view of the Main Opencast

2007–present

Sustained tungsten metal price rises resulted in a five-fold increase in the price of ammonium paratungstate (an intermediate product of tungsten), from around US$60 per STU in 2003, to in excess of US$240 per STU from 2006.[34] This has resulted in increased tungsten mining exploration and development activities globally since 2005.[35]

In June 2007, ASX-listed specialty metal exploration and development company, Wolf Minerals, suspended trading of shares pending the acquiring of mineral leases.[36] On December 5, 2007 trading recommenced following the public announcement of acquiring the mineral leases for the Hemerdon Mine project. The mineral leases were made for a period of 40 years, with the Hemerdon Mineral Trust and the Olver Trust. An agreement with Imerys to purchase remaining mineral rights and freehold land was also made.[37] Following agreements with local landowners to acquire surface rights, Wolf Minerals renamed the project the Drakelands Mine to "recognise the local community".[38]

SRK Consulting were commissioned to produce a JORC-compliant resource using previous drilling data.[39] This was released in March 2008. Subsequently it has been updated twice by SRK Consulting to incorporate new drilling data and revised geological modelling. The resource of over 300,000 tonnes of tungsten metal makes Drakelands the fourth largest tungsten deposit in the world.[40] In 2009, funding for a DFS (definitive feasibility study) was achieved with the support Resource Capital Funds and Traxys, completed in May 2011.[41] Mining operations commenced in 2014,[42] with first ore into the plant June 2015 and first concentrate production scheduled for September 2015.[43] The project has planning permission dating back to 1986, which is valid till 2021. If production levels are achieved as anticipated, the mine would be the largest tungsten concentrate producer in the world. A planning application is in process to extend the pit slightly further to the South West to further increase reserves.[44]

Hemerdon Ball JORC Revised Resource estimate completed by SRK Consulting in June 2010
Resource Category Ore Tonnage (Mt) Sn grade (%) WO3 grade (%) Contained Sn (tonnes) Contained W (tonnes)
Measured 48.53 0.02 0.19 9700 72800
Indicated 22.39 0.02 0.18 4500 40300
Inferred 147.61 0.02 0.18 29500 206700
TOTAL 218.53 0.02 0.18 43700 318800
Source:[45]

Processing

The Drakelands processing plant relies on a number of different processes to recover tin and tungsten and discard gangue minerals such as arsenopyrite and haematite. Broadly speaking, the process involves crushing and sizing, followed by gravity separation on fine material and dense media separation (DMS) on coarse material. The concentrates from these processes are then milled, followed by flotation and roasting, finishing with magnetic separation and further gravity separation to produce the final tungsten and tin concentrates respectively.

The processing plant was built by GR Engineering Services from Perth and consists of a primary/secondary crusher building near the mine and stockpile, feeding the main processing plant via conveyor, and a tertiary crusher building. Design recoveries of tin and tungsten are in the range of 58 - 66% depending on feed type (soft granite near-surface, hard granite towards depth), with grades of >60% tungstate and tin as final products.

Crushing and Sizing

Two Sandvik hybrid rolls crushers perform the primary and secondary crushing duties at gaps of approximately 60 and 40 mm respectively. These crushers were preferred over jaw crushers as they should cope better with the high clay content of the ore in the early years of operation. The secondary crusher product is conveyed into a Sepro scrubber where the material is washed to remove fines sticking to the coarser material. The majority of material from the scrubber reports to a double-deck screen, sizing at 9 and 4 mm. Oversize material (>9 mm) material from the scrubber and this screen is conveyed to two Sandvik cone crushers with a closed size setting of 12 - 15 mm, before returning onto the scrubber screen. Material between 9 and 4 mm in size reports to the DMS circuit. The undersize from the scrubber screen (<4 mm) is pumped onto a second screen where it is sized at 0.5 mm. The oversize for this screen makes up further DMS feed, and the undersize from this screen (< 0.5mm) reports to a large holding tank that stores feed for the gravity circuit.

Gravity Separation

Wolframite and cassiterite are heavy minerals, making them very suitable for recovery by gravity separation. The gravity separation process at the Drakelands processing plant starts two steps of desliming using Multotec deslime cyclones, designed to cut at 63 and 45 micron respectively. The underflow from these spirals goes to 3 banks of 11 3-start MG6.3 Mineral Technologies spirals (99 spirals in total), producing a rougher concentrate that reports to the cleaner spirals, a middlings product that goes to a bank of 33 middlings spirals and tailings that go to the 25m diameter thickener. The middlings spirals (also MG6.3) tailings go to the thickener, and the concentrate is sent to the cleaner spirals. The cleaner spirals (4x MG6.3) tailings are recycled to the rougher spirals and the concentrate is sent to Holmans tables for further refining.

After dewatering using Multotec cyclones, two Holmans Wilfley shaking tables are used to produce a rougher table concentrate. This concentrate is sized at 90 micron using a Derrick screen and dewatered using cyclones followed by two further steps of cleaning/recleaning (also on Holmans Wilfley shaking tables) to produce the final coarse and fine gravity concentrate. The tailings and middling from the rougher table reports back to the rougher spiral feed, whilst cleaner table middlings/tailings are sent back to the rougher tables and re-cleaner table middlings and tailings are sent back to the cleaner tables.

Dense Media Separation

The -9 +0.5 mm fraction produced by the crushing/washing/sizing circuit is stored in a feed bin with approximately 4-5h capacity. A prep screen washes any remaining <0.5 mm material that inadvertently reported to the DMS feed into an effluent tank. The >0.5 mm product reports into two mixing boxes where it is mixed with primary DMS dense medium, before being pumped up to the primary DMS cyclones. There are two identical DMS circuits consisting of 3 Multotec cyclones fed by VSD pump set at 180 kPa and a cut density close to 2.7g/cm^3, so as to separate out the majority of silicates whilst not losing any particles containing heavy minerals. The floats and sinks from these cyclones report to drain/rinse screens where the respective products are separated from the medium. Primary DMS floats go to the tailings storage facility via conveyor and large storage tanks, whilst sinks are sent to the secondary DMS circuit for further refining.

The secondary DMS circuit further refines the primary DMS sinks, producing a final DMS concentrate (sinks). The cut point of this circuit is around 3.2 g/cm^3, allowing rejection of binary particles with excessive silicate content as well as any heavier gangue particles. The floats are sent to an Ersel ball mill operating in closed circuit with a double-deck sizing screen. The >1.7 mm portion of the mill product returns to the mill for further grinding, the -1.7 +0.5 mm product makes up scavenger DMS feed, and the <0.5 mm product is combined with DMS effluent cyclone underflow to make up additional feed to the fines storage tank. The scavenger DMS circuit is identical to the secondary DMS circuit but operates on a finer feed. Floats report to the mill for further grinding and sinks make up an additional stream of DMS concentrate.

The medium in the primary DMS circuit consists of a mixture of milled ferrosilicon and magnetite, with the exact mix regulated to maintain appropriate medium stability. The secondary and scavenger DMS correct mediums consist purely of atomised ferrosilicon. All correct mediums are kept at the correct density using a set of densifiers, supplemented by low intensity wet magnetic separators (LIMS) removing ferrosilicon from the dilute medium. The non-magnetic proportion of the LIMS feed reports to the same effluent tank that also contains the <0.5 mm proportion of the feed removed by the prep screen. The DMS effluent is dewatered using a set of cyclones, with the underflow reporting to the fines storage tank feeding the gravity circuit.

Concentrate Processing

The feed into the concentrate processing section is made up of fines concentrate (<0.5 mm) and DMS concentrate (-9 +0.5 mm), containing mainly wolframite, cassiterite, iron oxides, and some silicates and arsenic minerals. The DMS concentrate is fed into a regrind ball mill which operates in closed circuit with a 450 micron Derrick sizing screen. The fines concentrate reports onto this Derrick screen directly to avoid over-grinding of the finer portion of this stream. The undersize of the regrind mill sizing screen is pumped via a dewatering cyclone into a conditioning tank. In this tank, several chemicals are added to enable sulphide flotation in three Outotec Denver flotation cells, targeting removal of arsenopyrite. The sulphide concentrate (floats) is pumped to the thickener for disposal, and the underflow (roaster feed) is dewatered using a filter belt. In the soft granite the arsenic occurs mainly as scorodite, which cannot be floated.

The roasting process involves drying using a Drytech pre-dryer that thoroughly dries the pre-concentrate before feeding into a reduction kiln. This kiln uses diesel as a reductant to generate carbon monoxide, which reacts with haematite and other iron oxides in the feed at approximately 700°C, to create magnetite or maghemite whilst leaving other minerals largely unaffected. This process changes paramagnetic hematite into ferromagnetic maghemite/magnetite. Wolframite, like hematite, is paramagnetic and without this reduction step separation of hematite and wolframite would be impossible using magnetic separators.

The reduced ore from the kiln is cooled and fed onto a low intensity magnetic separator (LIMS) which is designed to remove the now highly magnetic iron oxides, which are sent to the tailings thickener. The non-magnetic product from the LIMS is sized at 150 micron on a dry Derrick screen before free-flowing to a multi-stage high gradient disc electromagnetic separator (VOG HIMS), with the goal of separating tungsten from non-magnetic minerals such as cassiterite and silicate. These HIMS produce six streams of varying quality tungsten concentrate grading up to >60% tungstate.

Removal of wolframite and other paramagnetic minerals leaves a coarse and a fine non-magnetic stream rich in tin and silicates. Refining of this stream to remove silicates (mainly quartz and tourmaline) is done using Holmans Wilfley shaking tables. The tailings from this process are combined with the LIMS tailings before pumping to the tailings thickener. The concentrate is filtered on a belt filter before drying in a smaller dryer.


See also

References

  1. Mindat online database
  2. Mineweb Article
  3. Tungsten and tin mine to reopen, BBC news, Tuesday, 4 December 2007, 09:12 GMT
  4. "THE HEMERDON PROJECT (Drakelands Mine) information pack" (PDF). www.wolfminerals.com.au. June 2014. Retrieved 2015-07-06.
  5. Devon County Council Register of Geological Sites
  6. CSM Virtual Museum Field Excursion
  7. Wolf Minerals
  8. Crystal Classics Article
  9. 1 2 Devon CMLP – IP38,Devon County Council
  10. , Cornwall’s Premier Tungsten Mine with brief comparative histories of other Wolfram Mines in Cornwall & West Devon, Cornish Hillside Publications, 2001, p128
  11. Statement by WSC, Churchill Archives Centre
  12. Terrell E. The Hemerdon Wolfram-Tin Mine, Mining Magazine February 1920, p75-87
  13. Dines HG, The Metalliferous Mining Region of SW England, HMSO, 1956, p689
  14. Cameron J, The Geology of Hemerdon Wolfram Mine, Devon, IMM, Oct 1951, p1
  15. Cameron J, The Geology of Hemerdon Wolfram Mine, Devon, IMM, Oct 1951, p121
  16. Tungsten Mineral Resources Consultative Committee, HMSO, 1973, p8.
  17. Mining Journal, November 24, 1950, p504
  18. Perkins JW, Geology Explained: Dartmoor and the Tamar Valley, p71, 1972
  19. US Bureau of Mines, Minerals yearbook metals, minerals, and fuels 1970
  20. US Bureau of Mines, Minerals yearbook area reports: international 1977
  21. Amax-Hemerdon Venture Evaluation Major Tin-Tungsten Property – Skillings Mining Review, vol.69, No.23, June 7, 1980
  22. US Bureau of Mines, Minerals yearbook area reports: international 1979
  23. 1 2 US Bureau of Mines, yearbook metals and minerals 1980
  24. US Bureau of Mines, Minerals yearbook metals and minerals 1980
  25. Feasibility Study for a Mine and Concentrator Complex at Hemerdon Nr Plymouth, England. Produced for AMAX/HMSL Joint Venture, February 1982
  26. US Bureau of Mines, Minerals yearbook area reports: international 1983
  27. US Bureau of Mines, Minerals yearbook area reports: international 1984
  28. US Bureau of Mines, Minerals yearbook area reports: international 1985
  29. Mining Journal, April 19, 1985
  30. US Bureau of Mines, Minerals yearbook metals and minerals 1986
  31. Press Release October 16, 1997, North American Tungsten Corporation Ltd
  32. Long Form Prospectus, North American Tungsten Corporation Ltd, May 14, 2002
  33. North American Tungsten Financial Statement 2005
  34. Tungsten Price Graph
  35. Tungsten AIMR Report 2007
  36. Wolf Minerals Press Release
  37. Wolf Minerals Press Release
  38. "Drakelands Mine". Wolf Minerals Ltd. Retrieved 10 November 2014.
  39. Wolf Minerals Press Release
  40. USGS International Strategic Minerals Summary Report – Tungsten, p12
  41. "Hemerdon tungsten study 'positive', says Wolf Minerals". BBC. 17 May 2011. Retrieved 17 May 2011.
  42. "Work starts on £130m Devon tungsten mine". BBC News. 9 June 2014. Retrieved 20 March 2015.
  43. Wolf Minerals Presentation
  44. Investor Presentation August 2015
  45. Wolf Minerals Website
Wikimedia Commons has media related to Hemerdon Mine.

Coordinates: 50°24′36″N 4°00′36″W / 50.410°N 4.010°W / 50.410; -4.010

This article is issued from Wikipedia - version of the 8/12/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.