Fortune's algorithm

Fortune's algorithm is a sweep line algorithm for generating a Voronoi diagram from a set of points in a plane using O(n log n) time and O(n) space.[1][2] It was originally published by Steven Fortune in 1986 in his paper "A sweepline algorithm for Voronoi diagrams."[3]

Algorithm description

The algorithm maintains both a sweep line and a beach line, which both move through the plane as the algorithm progresses. The sweep line is a straight line, which we may by convention assume to be vertical and moving left to right across the plane. At any time during the algorithm, the input points left of the sweep line will have been incorporated into the Voronoi diagram, while the points right of the sweep line will not have been considered yet. The beach line is not a line, but a complicated, piecewise curve to the left of the sweep line, composed of pieces of parabolas; it divides the portion of the plane within which the Voronoi diagram can be known, regardless of what other points might be right of the sweep line, from the rest of the plane. For each point left of the sweep line, one can define a parabola of points equidistant from that point and from the sweep line; the beach line is the boundary of the union of these parabolas. As the sweep line progresses, the vertices of the beach line, at which two parabolas cross, trace out the edges of the Voronoi diagram. The beach line progresses by keeping each parabola base exactly half way between the points initially swept over with the sweep line, and the new position of the sweep line. Mathematically, this means each parabola is formed by using the sweep line as the directrix and the input point as the focus.

The algorithm maintains as data structures a binary search tree describing the combinatorial structure of the beach line, and a priority queue listing potential future events that could change the beach line structure. These events include the addition of another parabola to the beach line (when the sweep line crosses another input point) and the removal of a curve from the beach line (when the sweep line becomes tangent to a circle through some three input points whose parabolas form consecutive segments of the beach line). Each such event may be prioritized by the x-coordinate of the sweep line at the point the event occurs. The algorithm itself then consists of repeatedly removing the next event from the priority queue, finding the changes the event causes in the beach line, and updating the data structures.

As there are O(n) events to process (each being associated with some feature of the Voronoi diagram) and O(log n) time to process an event (each consisting of a constant number of binary search tree and priority queue operations) the total time is O(n log n).

Pseudocode

Pseudocode description of the algorithm.[4]

let  be the transformation ,
  where  is the Euclidean distance between z and the nearest site
let T be the "beach line"
let  be the region covered by site p.
let  be the boundary ray between sites p and q.
let  be the sites with minimal y-coordinate, ordered by x-coordinate

create initial vertical boundary rays 

while not IsEmpty(Q) do
    p ← DeleteMin(Q)
    case p of
    p is a site in :
        find the occurrence of a region  in T containing p,
          bracketed by  on the left and  on the right
        create new boundary rays  and  with bases p
        replace  with  in T
        delete from Q any intersection between  and 
        insert into Q any intersection between  and 
        insert into Q any intersection between  and 
    p is a Voronoi vertex in :
        let p be the intersection of  on the left and  on the right
        let  be the left neighbor of  and
          let  be the right neighbor of  in T
        create a new boundary ray  if ,
          or create  if p is right of the higher of q and s,
          otherwise create 
        replace  with newly created  in T
        delete from Q any intersection between  and 
        delete from Q any intersection between  and 
        insert into Q any intersection between  and 
        insert into Q any intersection between  and 
        record p as the summit of  and  and the base of 
        output the boundary segments  and 
    endcase
endwhile
output the remaining boundary rays in T

Weighted sites and disks

As Fortune describes in [1] a modified version of the sweepline algorithm can be used to construct an additively weighted Voronoi diagram, in which the distance to each site is offset by the weight of the site; this may equivalently be viewed as a Voronoi diagram of a set of disks, centered at the sites with radius equal to the weight of the site.

Weighted sites may be used to control the areas of the Voronoi cells when using Voronoi diagrams to construct treemaps. In an additively weighted Voronoi diagram, the bisector between sites is in general a hyperbola, in contrast to unweighted Voronoi diagrams and power diagrams of disks for which it is a straight line.

References

  1. 1 2 Mark de Berg, Marc van Kreveld, Mark Overmars, and Otfried Schwarzkopf (2000), Computational Geometry (2nd revised ed.), Springer-Verlag, ISBN 3-540-65620-0 Section 7.2: Computing the Voronoi Diagram: pp.151160.
  2. Austin, David, Voronoi Diagrams and a Day at the Beach, Feature Column, American Mathematical Society.
  3. Steven Fortune. A sweepline algorithm for Voronoi diagrams. Proceedings of the second annual symposium on Computational geometry. Yorktown Heights, New York, United States, pp.313322. 1986. ISBN 0-89791-194-6. ACM Digital LibrarySpringerLink
  4. Kenny Wong, Hausi A. Müller, An Efficient Implementation of Fortune's Plane-Sweep Algorithm for Voronoi Diagrams.

External links

This article is issued from Wikipedia - version of the 8/11/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.