Caltrain

Not to be confused with Caltrans.
For the short-lived service in Los Angeles, see CalTrain.
Caltrain
Cal in black letters, with train inscribed within a red circle, all letters italicized

Baby Bullet train at San José Diridon Station

Local train leaving San Francisco 4th & King
Overview
Owner Peninsula Corridor Joint Powers Board
Area served San Francisco Peninsula
Santa Clara Valley
Locale San Francisco, San Mateo, and Santa Clara
Transit type Commuter rail
Number of lines 1
Number of stations 32
Daily ridership 58,245 weekdays
17,392 Saturdays
8,849 Sundays
(February 2015 average)[1]
Headquarters San Carlos, California
Website http://www.caltrain.com
Operation
Began operation 1987
1863 (as Peninsula Commute)
Operator(s) Amtrak (1992–2012)
TransitAmerica Services (2012–present)
Reporting marks JPBX
Host railroads JPBX (San Francisco–Tamien)
Union Pacific (Tamien–Gilroy)
Character commuter railroad with level crossings
partial service on freight lines
Number of vehicles 29 locomotives
118 passenger cars[2]
Train length 1 locomotive, 5 or 6 passenger cars
Technical
System length 77.4 mi (124.6 km)
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge
Electrification 25 kV 60 Hz AC overhead line[3] (2020)
Top speed 79 mph (127 km/h)
System map

Legend
Embarcadero Station
via pedestrian tunnel
Transbay Transit Center planned
0.2 mi
0.3 km
San Francisco
1.9 mi
3.1 km
22nd Street
Oakdale proposed
4.1 mi
6.6 km
Paul Avenue closed
5.2 mi
8.4 km
Bayshore
San Francisco
San Mateo County
8.6 mi
13.8 km
Butler Road closed
9.3 mi
15 km
South San Francisco
11.6 mi
18.7 km
San Bruno
Fare zone 1
Fare zone 2
13.7 mi
22 km
Millbrae Bay Area Rapid Transit San Francisco International Airport
15.2 mi
24.5 km
Broadway
weekends
only
16.3 mi
26.2 km
Burlingame
17.9 mi
28.8 km
San Mateo
19.1 mi
30.7 km
Hayward Park
20.0 mi
32.2 km
Bay Meadows closed
20.3 mi
32.7 km
Hillsdale
21.9 mi
35.2 km
Belmont
23.2 mi
37.3 km
San Carlos
25.4 mi
40.9 km
Redwood City
timed
transfer
Fare zone 2
Fare zone 3
Dumbarton extension
Second Ave. proposed
27.8 mi
44.7 km
Atherton
weekends
only
28.9 mi
46.5 km
Menlo Park
Willow Road proposed
San Mateo County
Alameda County
Newark proposed
Fremont-Centerville proposed
Union City proposed
San Mateo County
Santa Clara County
30.1 mi
48.4 km
Palo Alto
30.8 mi
49.6 km
Stanford
game days
only
31.8 mi
51.2 km
California Avenue
34.1 mi
54.9 km
San Antonio
34.9 mi
56.2 km
Castro closed
36.1 mi
58.1 km
Mountain View Santa Clara VTA
38.8 mi
62.4 km
Sunnyvale
Fare zone 3
Fare zone 4
40.8 mi
65.7 km
Lawrence
44.3 mi
71.3 km
Santa Clara Amtrak Altamont Corridor Express San Jose International Airport
45.7 mi
73.5 km
College Park
Bellarmine
commutes
CEMOF
Mountain View–Winchester (VTA)
46.9 mi
75.5 km
San Jose Diridon Santa Clara VTA Amtrak Altamont Corridor Express
Alum Rock–Santa Teresa (VTA)
49.1 mi
79 km
Tamien Santa Clara VTA
Fare zone 4
Fare zone 5
52.4 mi
84.3 km
Capitol
weekday
commutes
55.7 mi
89.6 km
Blossom Hill
weekday
commutes
Fare zone 5
Fare zone 6
67.5 mi
108.6 km
Morgan Hill
weekday
commutes
71.2 mi
114.6 km
San Martin
weekday
commutes
77.4 mi
124.6 km
Gilroy
weekday
commutes
Salinas proposed

Caltrain is a California commuter rail line on the San Francisco Peninsula and in the Santa Clara Valley (Silicon Valley). The northern terminus of the line is in San Francisco at 4th and King streets; its southern terminus is in Gilroy. Trains leave San Francisco and San Jose about hourly on weekdays, or more frequently during commute hours and for special events such as sporting events. Service between San Jose and Gilroy is limited to three weekday commute-time round trips. Weekday ridership in February 2015 averaged 58,245, up 10.7% from February 2014 and up 71% since 2010.[1]

Caltrain is governed by the Peninsula Corridor Joint Powers Board (PCJPB) which consists of agencies from the three counties served by Caltrain: San Francisco, San Mateo and Santa Clara. Each member agency has three representatives on a nine-member Board of Directors. The member agencies are the City and County of San Francisco, SamTrans and the Santa Clara Valley Transportation Authority.

Caltrain has 29 regular stops, one football-only stop (Stanford Stadium), and two weekend-only stops (Broadway and Atherton). As of October 2012 Caltrain runs 92 weekday trains (22 Baby Bullet), 36 Saturday (4 Baby Bullet), and 32 Sunday (4 Baby Bullet).[4]

History

Southern Pacific service

An SP locomotive pulls a Peninsula Commute train past Bayshore in April 1985
Main article: Peninsula Commute

The original commuter railroad built in 1863 was the San Francisco and San Jose Rail Road; it was purchased by Southern Pacific in 1870.

Southern Pacific double-tracked the line in 1904 and rerouted it via Bayshore. After 1945, ridership declined with the rise in automobile use; in 1977 SP petitioned the state Public Utilities Commission to discontinue the commute operation because of ongoing losses.

To preserve the commute service, in 1980 Caltrans contracted with SP and began to subsidize the operation. Caltrans purchased new locomotives and rolling stock, replacing SP equipment in 1985. Caltrain also upgraded stations, added shuttle buses to nearby employers, and dubbed the operation Caltrain.

Joint Powers Board

A Caltrain car manufactured by Nippon Sharyo.

The Peninsula Corridor Joint Powers Board was formed in 1987 to manage the line. Subsequently, San Mateo and Santa Clara Counties commissioned Earth Metrics, Inc., to prepare an Environmental Impact Report on right-of-way acquisition and expansion of operations. With state and local funding, the PCJPB bought the railroad right of way between San Francisco and San Jose from SP in 1991. The following year, PCJPB took responsibility for CalTrain operations and selected Amtrak as the contract operator. PCJPB extended the CalTrain service from San Jose to Gilroy, connecting to VTA Light Rail at Tamien Station in San Jose.

In July 1995 CalTrain became accessible to passengers in wheelchairs. Five months later, CalTrain increased the bicycle limit to 24 per train, making the service attractive to commuters in bicycle-friendly cities such as San Francisco and Palo Alto.

In July 1997 the current logo was adopted, and the official name became Caltrain.

In 1998 the San Francisco Municipal Railway extended the N Judah Muni Metro line from Market Street to the San Francisco Caltrain Station at 4th and King streets, providing a direct Caltrain-Muni Metro connection for the first time. A year later, VTA extended its light rail service from north Santa Clara to the Mountain View Caltrain station.

In June 2003, a passenger connection for the Bay Area Rapid Transit (BART) and Caltrain systems opened at Millbrae station just south of the San Francisco International Airport.[5]

In 2006, Caltrain announced that wireless internet access (using WiMAX) would be available on trains at no additional charge, by the end of 2007.[6] Caltrain invested more than $1 million in researching and testing WiFi in 2006. The Caltrain Board of Directors voted at their August 30, 2007 meeting to keep the project from proceeding by rejecting both bids to provide the service, citing both bids not meeting the expectation of Caltrain. Caltrain still hopes to offer the service eventually as part of a more comprehensive communication package.[7]

In 2008, Caltrain reached an all-time high of 98 trains each weekday.

Caltrain announced on August 19, 2011 a staff recommendation to sign a five-year, $62.5 million contract with Missouri based TransitAmerica Services, Inc., a subsidiary of Herzog Transit Systems, after taking proposals from three other firms, including Amtrak, which has provided operating employees since 1992.[8] The new operating contract was approved by the full Joint Powers Board at its scheduled September 1 meeting. TransitAmerica Services will take over not only the conductor and engineer jobs on the trains, but also dispatching and maintenance of equipment, track, and right-of-way from Amtrak. The changeover was estimated to take about five months beginning in late 2011. On May 26, 2012 (during the Memorial Day weekend), TransitAmerica took over full operations.[9]

Baby Bullet service

Baby Bullet service is provided by MPI MP36PH-3C locomotives.

In June 2004, Caltrain finished its two-year CTX (Caltrain Express) project for a new express service called the Baby Bullet. The project entailed new bypass tracks in Brisbane and Sunnyvale as well as a new centralized traffic control system. The Baby Bullet trains reduced travel time by stopping at only four or five stations between San Francisco and San Jose Diridon Station; the express trains could overtake local trains at the two locations (near Bayshore and Lawrence stations) where bypass tracks were added. Travel time for about 46.75 miles between San Francisco and San Jose is 57 minutes (four stops), 59 minutes (five stops) or 61 minutes (six stops), compared to 1 hour 30 minutes for locals. The Baby Bullets have the same top speed of 79 mph (127 km/h) as other trains, but fewer stops save time. The CTX project included the purchase of new Bombardier BiLevel Coaches along with MPI MP36PH-3C locomotives.[10] The Baby Bullets have proved popular, but they skip most stations so many riders have longer commutes on non-bullet trains, some of which wait for Baby Bullet trains to pass.[11]

In May 2005 Caltrain started a series of fare increases and schedule changes in response to a projected budget shortfall. The frequency of the popular Baby Bullet express trains was increased; two express trains were added in May and another ten were added in August. New Baby Bullet stops, Pattern B stops, were introduced. Another increase of US$0.25 in basic fare came in January 2006.

Currently, each train is assigned a three-digit number indicating direction, sequence and stop pattern. This number is not to be confused with the locomotive number, which is the 9xx number physically stenciled on each engine. Only the MPI locomotives display all three digits; all others (EMD locomotives and control cars) display the last two digits only.

Train number locations on locomotives (top row) and control cars (bottom row)

Budget crisis

On April 2, 2010, Caltrain announced the need to cut its services by around 50%, as it was required to cut $30 million from its $97 million budget because all three authorities that fund the line were facing financial problems themselves and $10 million a year in previous state funding had been cut. Revenues for both local and state agencies had been steadily declining, as well as ticket revenues at Caltrain itself, and had left all "beyond broke."[14]

On January 1, 2011, Caltrain cut 4 midday trains but upgraded 4 weekend trains to Baby Bullet service as a pilot program. This reduced its schedule from 90 to 86 trains each weekday. At the same time, it raised fares $0.25 and continued to contemplate cutting weekday service to 48 trains during commute hours only.[15] By April 2011, Caltrain's board had approved a budget with fare increases to take effect on July 1, 2011, and no service cuts. The budget gap would be closed with another $0.25 fare increase, a $1 parking fee increase to $4, and additional money from other transit agencies and the MTC.[16][17]

Electrification

Caltrain awarded the electrification and EMU contracts at the July 7, 2016 PCJPB board meeting to Balfour Beatty and Stadler Rail, respectively,[18] signaling the start of modernization efforts that will make Caltrain more akin to rapid-transit services such as Bay Area Rapid Transit (BART) than traditional commuter services, and allow the future California High Speed Rail trains to reach San Francisco utilizing Caltrain tracks.

Future plans

Downtown San Francisco extension

A 1.3 mi (2.1 km) tunnel has been proposed to extend Caltrain from its north end in San Francisco at 4th and King to the newly built Transbay Transit Center,[19] closer to the job center of San Francisco and BART, Muni, Transbay AC Transit buses, and long-distance buses. As of 2012 only the structural "train box" below the Transbay Terminal has been funded and is being built.[20] In April 2012 the Metropolitan Transportation Commission decided to make the remainder of the $2.5 billion extension its top priority for federal funding.[21] The extension would also serve the California High-Speed Rail system.

An alternate proposal, put forth by Mayor Ed Lee, would see the existing terminal and trains yards demolished along with Interstate 280 in Mission Bay, then replaced with infill housing. Caltrain and high-speed rail would instead be extended to the Transbay Terminal in a new tunnel under Third Street.[22]

Dumbarton extension

Caltrain has been chosen to provide commuter rail service on a to-be-rebuilt Dumbarton Rail Corridor across the San Francisco Bay between the Peninsula and Alameda County in the East Bay. This project would add four stations to the Caltrain system: Union City, Fremont-Centerville, Newark, and Menlo Park/East Palo Alto. The two obsolete swing bridges along the corridor would be replaced.[23] Dumbarton Rail was scheduled to start construction in 2009 after a 30-month environmental review and begin service in 2012.[24] SamTrans, one of Caltrain's member agencies, already owns the right-of-way for the Dumbarton Rail Bridge. The bridge has not been used since 1982, when it was still owned by SP, and about 33% of the bridge collapsed due to an arson fire in 1998. However, the project's estimated cost doubled between 2004 and 2006, to US$ 600M,[25] and is financially problematic.[26] In January 2009, the Metropolitan Transportation Commission instead applied the funds to the BART Warm Springs Extension project in Fremont, delaying the Dumbarton rail project for at least a decade.[27]

South of Gilroy extension

Caltrain was approached by the Transportation Agency for Monterey County (TAMC) to extend service south of Gilroy into Monterey County. A draft environmental impact report stated the lack of public transportation between Monterey County and the Bay Area has resulted in increased private commuter vehicle traffic.[28] Traffic on US Highway 101 was projected to rise by up to 56% in 2020 compared to 1998 levels, resulting in unstable traffic flow from the Salinas city limits to the Santa Clara County line as a result.[28]

The concept of a Caltrain extension to Monterey County has been considered since at least 1996, with the cities of Salinas and Watsonville considering rail station improvements and construction between 1996 and 1998, culminating in a TAMC-sponsored Extension of Caltrain Commuter Service to Monterey County Business Plan in 2000. The proposed extension would create new stations and stops in Pajaro (serving Watsonville in adjacent Santa Cruz County at an estaimted cost of US$6,585,000 (equivalent to $7,743,000 in 2015))[28] and Castroville (at an estimated cost of US$11,150,000 (equivalent to $13,110,000 in 2015))[28] before terminating at the existing Salinas, Amtrak station with Coast Starlight service. The Salinas station would be rebuilt as an intermodal station to connect commuter rail with Monterey-Salinas Transit buses. A layover yard would be added to accommodate Caltrain crews and maintenance, and the total cost of the Salinas improvements was estimated at US$39,705,000 (equivalent to $46,685,000 in 2015).[28] The cost of operating commuter rail was estimated at US$64,900,000 (equivalent to $76,309,000 in 2015) for two daily roundtrips.[28]

This project depends on state and federal funding availability, a possible local sales tax measure, and an agreement with Union Pacific, the owner of the Salinas-to-Gilroy tracks and right-of-way. This project is managed by TAMC, who released the Final Environment Impact Report (EIR) for this project in 2006.[29] This would complement another plan to re-establish rail service last provided by Southern Pacific Railroad's Del Monte Express which operated between Monterey and San Francisco.

In 2009, Caltrain requested that TAMC approach other train operators. TAMC subsequently opened discussions with the Capitol Corridor Joint Powers Authority and the Caltrans Division of Rail to extend Capitol Corridor service south from San Jose to Salinas using the same routing and stations.[30] The switch to Capitol Corridor was cited as an advantage, since CCJPA had experience with commuter trains sharing service on Union Pacific-owned freight right-of-way. Two Capitol Corridor trains would originate from Salinas in the mornings and run through to San Jose and on to Sacramento, with two evening trains making the return trip south to Salinas.[30]

Modernization and electrification

The Caltrain Modernization Program will electrify the main line between San Francisco and the San Jose Tamien Station, allowing transition from diesel-electric locomotive power to fully electric rolling stock.[31] Proponents say electrification would improve service times via faster acceleration, allow better scheduling and reduce air pollution and noise. Electrification would also allow future expansion to downtown San Francisco.[32] Electrified vehicles require less maintenance, but electrification will increase required track maintenance by about the same dollar amount, at least initially. The plan calls to electrify the system between San Francisco 4th and King Street Station and San Jose Tamien Station by 2020.[31][33] At that point, Caltrain plans to use electric multiple units and increase service to six trains per hour in each direction.[32][34]

The electrification project between San Francisco and Tamien is the first phase, the second phase being from Tamien Station to Gilroy.[35] Cost, excluding electric rolling stock, for the first phase was estimated at $471 million (2006 dollars). By 2016, costs had increased to $1.7 billion.[36] As part of the Caltrain Modernization Program and mandated by the federal government, positive train control was installed along the route between San Francisco and San Jose by late 2015.[37]

Caltrain plans to use lighter electric multiple units that do not comply with the US Federal Railroad Administration (FRA) crash-worthiness standards, but instead comply with the International Union of Railways (UIC) standards, on the electrified lines. FRA granted Caltrain a waiver to operate these units, which were previously banned on mix-used lines with other FRA-compliant rolling stock due to concerns over crash worthiness, after Caltrain submitted simulation data showing UIC-compliant rolling stock performed no worse or even better than FRA-compliant rolling stock in crashes.[38][39] Caltrain plans to retain their newer diesel-electric rolling stock for use on the Dumbarton Extension and service south of Tamien. In August 2016, Caltrain ordered sixteen six-car double-decker electric multiple unit Stadler Rail trainsets.[3] The price is $166m for the 16 units, or $551m including an option of 96 more EMU.

California High-Speed Rail

The length of the Caltrain line from Gilroy to San Francisco is part of the planned route of the California High-Speed Rail line. Trains are predicted to travel at speeds up to 110 miles per hour (180 km/h) between San Jose and San Francisco.[40] The Gilroy–Tamien portion is now freight-owned track (owned by Union Pacific), so FRA would require dedicated tracks next to the present track.

Right of way

The Caltrain right of way between San Francisco and Tamien stations is owned and maintained by its operating agency, the Peninsula Corridor Joint Powers Board (PCJPB). PCJPB purchased the right of way from Southern Pacific (SP) in 1991, while SP maintained rights to inter-city passenger and freight trains. In exchange SP granted PCJPB rights to operate up to 6 trains per day between Tamien and Gilroy stations, later increased to 10 trains per day on a deal with SP's successor Union Pacific (UP) in 2005.

Stations

The system has 32 stations, 29 served daily and two weekend-only. San Francisco 4th and King Street is the northern terminus of the system, while Gilroy is the southern terminus. Atherton and Broadway are served only on weekends, and Stanford is served only on Stanford University's football game days.[41] College Park is served only on weekdays during Bellarmine College Preparatory's school commute time. Tamien is served by train on weekdays and by shuttle bus on weekends. The five southernmost stations—Capitol, Blossom Hill, Morgan Hill, San Martin, and Gilroy—are served only on weekdays during commute time. Twelve stations are served by the express train service known as Baby Bullet, inaugurated in 2004.[42] Two stations, Sunnyvale and Santa Clara, are not long enough to accommodate six-car trains without minor service impacts.[43] Seven stations (Millbrae, Burlingame, San Carlos, Menlo Park, Palo Alto, Santa Clara, and San Jose Diridon) are listed on the National Register of Historic Places.[44]

Maintenance and operations facility

The Centralized Equipment Maintenance and Operations Facility is a new train maintenance yard and facility north of San Jose Diridon station in San Jose.[45] The US$140 million maintenance station began construction in 2004 and opened on September 29, 2007.[46][47] It consolidates much of Caltrain's maintenance and operations into one location.[48]

Ticketing and ridership

Caltrain Average Weekday Ridership by year
Survey done every February.[1][49][50][51]
1997 26,043
1998 27,967
1999 27,591
2000 31,291
2001 35,609
2002 30,961
2003 27,191
2004 25,550
2005 28,393
2006 32,031
2007 33,841
2008 36,993
2009 39,122
2010 36,778
2011 37,779
2012 42,354
2013 47,060
2014 52,611
2015 58,245
2016 62,416

Caltrain ridership more than doubled between 2005 and 2015.[52] Ridership growth has been linked to the expansion of businesses near Caltrain stations, a shift in attitudes against the use of cars for commuting, and the expansion Caltrain service which has included extra trains and the introduction of fast express services (Baby Bullet service).[53][54]

Caltrain uses a proof-of-payment system: each rider must buy a ticket prior to boarding the train that may or may not be checked during the trip.[55][56] Passengers who board the train without a viable ticket are subject to fines of up to $250 plus court fees.[55][56]

Passengers who use the electronic Clipper card to ride must remember to "tag on" with their card prior to boarding and "tag off" with their card after exiting the train.[57] If they board the train without tagging on, they will be subject to the same fines.[56][57] In addition, Caltrain passengers are charged the maximum one way fare when they tag on prior to boarding the train and the difference is reimbursed when they tag off after leaving the train. If passengers who use the Clipper card fail to tag off when they exit the train, they will be charged "the highest cash fare from [their] point of origin."[58]

Fares for Caltrain service are based on the number of zones traveled (see above). One-way tickets expire four hours after purchase, but round-trip tickets ("day passes") are good for unlimited rides within their zone limit until the last train of the day. Discounted 8-ride tickets and monthly passes are available only with a Clipper card. Seniors, children, and the disabled ride for roughly half price (varies depending on the ticket). One-way full fares are (as of March 1, 2016):[59]

Day-Pass is double the one-way, while Clipper card users have a $0.50 discount on the one way full fares.

Zone ticketing requires little infrastructure at the stations but can be expensive for passengers making a short trip that crosses a zone boundary (each zone is 13 miles long). Travel from Sunnyvale to Lawrence (2.0 miles / 3.2 km) costs $5.75, the same as San Francisco to Redwood City (25.3 miles / 40.8 km).

In August 2009 Caltrain became the fifth public transit agency in the San Francisco Bay Area to implement the Clipper card.[60]

Cost and budget

The Peninsula Corridor Joint Powers Board purchased the right of way between San Francisco and San Jose for $212 million from Southern Pacific in 1991. The operating expenses for fiscal year 2011 were $95,628,000. The fare revenue was $49,026,000, making the farebox recovery ratio 51.3%.[68] This rose to 59% in fiscal year 2012[69] and 64% in 2013.[70][73]

Rolling stock

Locomotives

Prior to 1985, Caltrain used equipment leased from Southern Pacific, including SP/CDTX 3187, an EMD GP9 repainted in prototype Caltrain livery[74] and other locomotives that had been used for the Peninsula Commute service. Since 1985, Caltrain has used the following locomotives, which are powered by diesel engines:[2]

Builder Model Locomotive Numbers Years of Service Notes Image
EMD F40PH-2 902, 903, 907, 910, 914 1985present Ordered new by Caltrans; Overhauled by Alstom in 1999; HEP generators retained original gear drive from main engine.
EMD F40PH-2CAT 900, 901, 904–906, 908, 909, 911–913, 915–919 1985present Originally F40PH-2s; ordered new by Caltrans; overhauled by Alstom in 1999 and HEP generators were converted to separate Caterpillar 6-cylinder engines. Units 918 and 919 entered service in 1987.
MPI F40PH-2C 920–922 1998present Cummins-powered HEP generators. No. 920 is the Operation Lifesaver unit.
MPI MP36PH-3C 923–928 2003present Primarily used for "Baby Bullet" service.
EMD GP9 500, 501
20002013 Work train/yard switcher service. 500 and 501 are ex-SP 3833 & SP 3842, respectively. Sold to Motive Power Resources late 2012, left Caltrain on March 8, 2013.
EMD MP15DC 503, 504 2003present Work train/yard switcher service.

Caltrain also leased a number of Amtrak F40PH's in 1998 and 1999 while Caltrain's F40PH-2's were being overhauled.

Passenger cars

Currently, Caltrain trains consist of one locomotive and a five- or six-car consist. Trains run in a puller configuration (led by the locomotive) towards San Jose and in a pusher configuration (led by the cab car) towards San Francisco, so the orientation of cars remains consistent. From north to south, Nippon Sharyo five-car gallery consists are arranged as:

Interior of a Nippon Sharyo bi-level passenger car.
  1. Cab/bike car
  2. Passenger trailer
  3. Passenger/luggage trailer
  4. Bike car
  5. Passenger trailer
  6. Locomotive

From north to south, Bombardier bi-level six-car consists are arranged as:[75]

  1. Cab/bike car
  2. Passenger trailer
  3. Passenger/luggage trailer
  4. Bike car
  5. Bike car (ex-Metrolink)
  6. Passenger trailer
  7. Locomotive

There are 93 bi-level gallery-type cars built by Nippon Sharyo in Caltrain's fleet, of which 66 are coaches and 27 are bike-accessible cab cars. Caltrans purchased the first 63 gallery cars in 1985 when it began subsidizing the commuter rail service. The other 30 were purchased by Caltrain in 2000, and the older cars were rebuilt by Nippon Sharyo around the same time.[2] Each gallery car has one set of exit doors on each side of the car.

Caltrain bought 14 remanufactured Budd Rail Diesel Car ("Boise Budd") single-level cars from Virginia Railway Express around 2000 for use on Special-Event trains.[76] These cars were sold in 2005 after Bombardier cars were delivered and are now in service on the Grand Canyon Railway.[77]

Caltrain purchased 17 Bombardier BiLevel Coaches in 2002, of which 10 are coaches, 5 are cab-bike cars, and 2 are cab-wheelchair cars.[2] Some of the Bombardier BiLevel Coaches were bought from the Sounder Commuter Rail. Caltrain purchased additional eight cars in 2008 to meet short-term passenger growth and to increase spare ratio. These Bombardier cars were initially used on Baby Bullet express trains, but they are now also used on limited-stop and local trains. Train consists use a single car manufacturer; the Bombardier cars are never mixed with the Nippon-Sharyo gallery cars.

Ex-Metrolink cars

JPBX 165, an ex-Metrolink car in Caltrain service

Caltrain purchased 16 used Bombardier BiLevel Coaches from Metrolink in 2014 to cope with increasing ridership by lengthening Bombardier sets from five to six cars. Four of the cars were put into service in May 2015 while other cars await their refurbishments.[43] Ex-Metrolink cars have retained their Metrolink blue-on-white livery, but Metrolink logos have been painted over and rolling stock numbers have been repainted with JPBX numbers.[78]

Builder Model Type Numbers Quantity Year Note Image
Nippon Sharyo Gallery Trailer-Luggage 3800-3825 26 1985–present
Trailer-Bike 3826-3835 10
Trailer 3836-3851 16 1985/1986–present
3852-3865 14 2000–present With wheel chair space and bathroom
Cab-Bike 4000-4020 21 1985–present With bathroom
4021-4026 6 2000–present With wheel chair space and bathroom
Bombardier Bi-Level Trailer 220-227, 229-230 9 2002–present With ADA compliant bathroom
231-236 6 2008–present
162-179 16 2015–present With ADA compliant bathroom
Purchased from Metrolink[79]
162 and 163 built in 1992, 164-179 built in 1997
Cab-Bike 112-118, 219 8 2002–present With ADA compliant bathroom
119-120 2 2008–present
Budd Rail Diesel Car Trailer (engine removed) 12 2000-2005 Built in 1952
Used for special event trains
Sold to Grand Canyon Railway
Cab-Control (engine removed) 2
SPV-2000 self-propelled 505 1 2007–present Track geometry car
Ex-FRA (DOTX T-10)

Electric Multiple Units

In August 2016, Caltrain awarded a $551 million contract to produce the trainsets needed for running on the electrified line – 96 Stadler KISS EMUs arranged into 16 trainsets will be delivered for testing by August 2019. Trains will be double-decked, 515 feet 3 inches (157.05 m) long and equipped for both 22 inches (560 mm) and 50.5 inches (1,280 mm) platform heights in anticipation of sharing facilities with California High-Speed Rail trains.[80] Units can reach speeds of 110 mph (177 km/h), though operations will likely be limited to 79 miles per hour (127 km/h).[40] The order came with the option to procure an additional 96 units in the future.[81][82]

Builder Model Quantity Numbers Years of Service Notes Image
Stadler KISS 96 2020 (expected) On order/under construction

Intermodal connections

Inter-City, Regional and Commuter rail

Caltrain has direct connections to three regional rail services; Bay Area Rapid Transit (BART) (with service to San Francisco, SFO, Oakland, Fremont, Richmond, Dublin, Concord, and Pittsburg) at the Millbrae Intermodal Station, Amtrak's Capitol Corridor and Coast Starlight trains, as well as Altamont Commuter Express at San Jose's Diridon Station and the Santa Clara station.

The future BART-to-San Jose extension would also introduce connecting BART service at Diridon station and Santa Clara station.

Bus/Light rail

Caltrain is served by a number of local bus/rail systems. These system include the San Francisco Municipal Railway (Muni), San Mateo County Transit District (SamTrans) and Santa Clara Valley Transportation Authority (VTA). (Additionally, Golden Gate Transit of Marin and Sonoma Counties is within 20 minutes' walking distance, or a short Muni ride via the N or T lines, from Caltrain's northern terminus.)

In August 2005, as part of its Vasona light rail project, the Santa Clara Valley Transportation Authority established its third transfer point with Caltrain at San Jose's central train station Diridon. In addition to many bus connections, VTA light rail service has two other Caltrain transfer points at San Jose's Tamien and at Mountain View. (Also, the Cottle light rail stop in southern San Jose is a mile from Caltrain's Blossom Hill station.)

The San Francisco Municipal Railway (Muni) has two light rail connections, the N Judah and T Third Street lines, at separate stops near the San Francisco 4th and King station. Muni intended to establish another light rail connection to the Bayshore station at Visitacion Valley in southern San Francisco for the T Third line, but this has been delayed indefinitely due to cost and design issues. The T Third opened on April 18, 2007 without the connection to Bayshore station.

Airport

Caltrain passengers may transfer to BART at the Millbrae Intermodal Station for travel to the San Francisco International Airport. Currently, Caltrain riders looking to transfer to the airport must also change BART trains at San Bruno station[83] during weekdays before 7 pm, as BART has eliminated direct service from Milbrae to SFO during those times; direct BART service between Millbrae and SFO still exists on nights and weekends. Prior to the opening of the airport extension in 2003 a free shuttle bus operated between Millbrae and the airport.[84]

There is a connection to San Jose International Airport via the free VTA shuttle bus No. 10 at the Santa Clara Station.[83]

Regional express bus

Caltrain is also served by AC Transit from Hayward at the Hillsdale station (Line M) and at Palo Alto station (Line U). This is in addition to the Dumbarton Express from Union City/Fremont at Palo Alto. Furthermore, Amtrak's Highway 17 Express bus from Santa Cruz and Monterey-Salinas Transit from Monterey at San Jose, as well as San Benito County Express from Hollister at Gilroy.

Bus shuttle

Caltrain sponsors many shuttle routes serving local employers on the Peninsula and in Silicon Valley. Shuttle connections via the Marguerite are available to Stanford University at the Palo Alto and California Avenue stations and San José State University at the San Jose Station.

Bicycle access

Caltrain "Bike Car" sign posted by car door.

Caltrain was one of the first commuter rail services to add bicycle capacity to its trains, inaugurating bicycle service in 1992 by allowing four bikes on certain trains.[85]

Bicycle ridership and policies

Caltrain Average Weekday Bicycle Ridership by year
Survey done every February. Only includes bicycles physically brought onto the train, not those left at the station.[86]
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
1,614 1,860 2,271 2,334 2,382 2,890 2,659 3,664 4,243 4,910 5,874 6,207

Folding bicycles are not restricted and can be carried on any car when folded.

A bicycle rack aboard a Caltrain gallery car.

All bicycle rack-equipped cars have a yellow "Bike Car" sign posted by the door. Cyclists are required to tie their bicycle to the rack with the bungee cord provided. Each rack can accommodate four bicycles. Because the bikes are stacked together against the racks, most riders place a destination tag, available from a conductor, on their bicycles to optimize placement and minimize shuffling.[87][88]

Bicyclists waiting to board Caltrain at the Palo Alto station.

The variation on bicycle capacity between trainsets has generated criticisms from the bicycling community, as cyclists may be denied boarding when a train reaches its bicycle capacity. The Baby Bullets, favored by many cyclists, often use lower bike-capacity Bombardier cars and cyclists may have to wait for slower trains with higher-capacity gallery cars, or seek alternate transportation.[89]

Due to equipment rotation and maintenance concerns, Caltrain said in 2009 that it could not dedicate cars with higher bike capacity on trains with high bike demand.[90] Eventually, two bike cars were added to every train consist by 2011,[91] and in 2016, a third bike car was added to Bombardier consists.[75]

To provide an alternative to bringing bicycles on board the trains, Caltrain has installed bicycle lockers at most stations, and constructed a new bicycle station at the San Francisco station.[92] In early 2008, the Caltrain sponsored Warm Planet bicycle station opened at the 4th and Townsend terminus. A bicycle station was open at the Palo Alto station from April 1999 to October 2004, and reopened in February 2007.[93] Nearly all stations have racks and/or lockers available to park bicycles.[94]

Bicycle cars

The initial pilot program launched in 1992 allowed up to four bikes per train for off-peak service, with bicycles were carried in the cab car (northernmost car). Bicycle capacity was expanded to twelve bikes per train for all trains in 1995, followed by a doubling to 24 bikes per train for all trains in 1996.[95]

Starting in 2001, gallery cars were modified for bicycle service.[95] Gallery cars modified for bicycle service removed seats from the lower level in the north half of the car, resulting in space to carry 32 bicycles per car. By 2006, Bombardier cars were also modified for bicycle service by partially removed seats from the lower level of the car, resulting in space to carry 16 bicycles per car.[85]

It was suggested that Caltrain could increase bicycle capacity by removing some seats from bicycle cars. Initially Caltrain rejected this idea because some trains are operated at seated capacity[92] and the seat removal would take space from other passengers. However, in early 2009 Caltrain announced that it would be expanding bicycle capacity by 8 spots by removing some seats in the bike cars, bringing bike capacity to 40 bikes on gallery cars and 24 bikes on Bombardier cars.[85] The expansion started several months later.[96] After this, bike capacity on trains was expanded by increasing the number of bike cars in a consist, rather than further modifying cars.

Train consists

At first, only the cab/control car (the northernmost car) of each train consist was modified for bicycle service.[96] Prior to 2009, Bombardier consists could carry 16 bicycles, and gallery consists could carry 32 bicycles. With the removal of additional seats in 2009, capacity rose to 24 and 40 bicycles, respectively.[85]

In the fall of 2009, all Bombardier consists and some gallery consists substituted a second bike car for one of the passenger trailers. The remaining gallery consists continued with a single bike car,[90] resulting in a carrying capacity of 48 bicycles (on Bombardier consists) or 40–80 bicycles (on gallery consists with one or two bike cars).[96] Due to demand, in 2011, the remaining gallery sets modified a passenger trailer to take bicycles, giving two bike cars to all consists, increasing capacity on all gallery consists to 80 bicycles per train.[97] 10 gallery trailer cars, 3826-3835, had their lower-level seats removed in 2011.[2][91] Although the Baby Bullet runs initially used five-car Bombardier consists, many of the Baby Bullet runs returned to five-car gallery sets due to their superior bicycle capacity, since demand for bicycle car access was high.

Prior to 2016, both Bombardier and gallery trains used five-car consists. With the purchase of Bombardier cars from Metrolink, Caltrain announced in January 2015 that roughly half of the additional ex-Metrolink cars will be converted to bike cars with capacity for 24 bikes, so some trains running Bombardier cars will be six-car consists, of which three will be bike cars.[98]

Six-car Bombardier consists started running in May 2015, but the third car was not converted for bike service until March 2016. Five of the Bombardier cars were refurbished as bike cars and entered service in March 2016. All Bombardier consists are now six-car sets with three bike cars and three passenger cars. The third bike car is just south of the existing southern bike car. The third bike car is being placed next to the other bike car to help conductors to manage bike capacity.[99] Official bike capacity for six-car Bombardier consists is 72 (24 bikes × 3 cars), comparable to the 80-bike capacity of five-car gallery consists (40 bikes × 2 cars).

See also

References

  1. 1 2 3 "2015 Annual Passenger Counts" (PDF). Caltrain. Retrieved May 11, 2015.
  2. 1 2 3 4 5 "Caltrain-Commute Fleet". Caltrain.com. Retrieved November 30, 2011.
  3. 1 2 Stadler Awarded Contract for 16 Double-Decker Trains by Caltrain
  4. "Schedules". Caltrain.com. October 1, 2012. Retrieved November 21, 2012.
  5. "History – Caltrain Milestones". Caltrain. Retrieved April 9, 2008.
  6. "Caltrain WiFi FAQs". Caltrain.org. January 13, 2011. Retrieved November 30, 2011.
  7. "Caltrain rejects two Wi-Fi bids, ending project". Paloaltoonline.com. Retrieved November 30, 2011.
  8. "Caltrain may drop Amtrak, switch to new conductor provider – San Jose Mercury News". Mercurynews.com. Retrieved November 30, 2011.
  9. "Jobs". Retrieved 12 June 2012.
  10. "Baby Bullet Information". Caltrain. Archived from the original on October 18, 2007. Retrieved April 9, 2008.
  11. Cabanatuan, Michael (June 8, 2004). "Bully for Baby Bullet, riders say". San Francisco Chronicle. Retrieved April 9, 2008.
  12. "Weekday Timetable". Caltrain. Joint Powers Board. 5 October 2014. Retrieved 5 April 2015.
  13. "Weekend Timetable". Caltrain. Joint Powers Board. 5 October 2014. Retrieved 5 April 2015.
  14. "Caltrain broke, major cuts planned". Trains Magazine. April 2, 2010. Retrieved April 2, 2010.
  15. "Caltrain Faces $30M Budget Shortfall and Drastic Service Cuts". Caltrain.com. January 19, 2011. Retrieved November 30, 2011.
  16. "Caltrain board OKs budget that keeps all trains running, all stations open – San Jose Mercury News". Mercurynews.com. Retrieved November 30, 2011.
  17. Crosson, Anastasia (May 12, 2011). "Caltrain Funding Reconfigured – Burlingame, CA Patch". Burlingame.patch.com. Retrieved November 30, 2011.
  18. "Caltrain awards electrification, EMU contracts". William C. Vantuono. Railway Age. July 8, 2016.
  19. "Transbay Transit Center". Transbay Joint Powers Authority (TJPA). November 24, 2011. Retrieved December 6, 2014.
  20. "Transbay Transit Center/Caltrain Downtown Extension". San Francisco County Transportation Authority. Retrieved June 14, 2012.
  21. Cabanatuan, Michael; Lee, Stephanie M.; Knight, Heather (April 16, 2012). "Caltrain downtown extension gets top billing for top dollar". San Francisco Chronicle.
  22. Matier & Ross (May 11, 2015). "I-280 near Mission Bay would be razed in Caltrain tunnel plan". SFGate. Retrieved 26 May 2015.
  23. "Dumbarton Rail Corridor". San Mateo County Transportation Authority. Retrieved January 24, 2007.
  24. Winegarner, Beth (June 28, 2006). "Finish date for Dumbarton rail plan pushed back to 2012". San Francisco Examiner.
  25. Albach, Banks (November 16, 2006). "Officials delve into Dumbarton puzzle". Palo Alto Daily News.
  26. Oremus, Will (June 15, 2008). "Dumbarton rail faces financial fight". Redwood City Daily News.
  27. Rosenberg, Mike (June 11, 2009). "Dumbarton Rail Lawsuit Dropped". Oakland Tribune.
  28. 1 2 3 4 5 6 Parsons Transportation Group (26 April 2006). Caltrain Extension to Monterey County Passenger Rail Stations—Volume I: Draft Environmental Impact Report (PDF) (Report). Transportation Agency of Monterey County. Retrieved 3 July 2016.
  29. Parsons Transportation Group (July 2006). Caltrain Extension to Monterey County Passenger Rail Stations—Volume III Final Environment Impact Report (EIR) (PDF) (Report). San Jose, California: Transportation Agency of Monterey County. Retrieved December 6, 2014.
  30. 1 2 Parsons (August 2013). Addendum: Capitol Corridor Extension to Monterey County Environmental Impact Report (PDF) (Report). Transportation Agency for Monterey County. Retrieved 3 July 2016.
  31. 1 2 Bartholemew, Tasha (21 April 2016). "Modernization: Electrifying the Bay Area's Silicon Valley Rail Corridor". Mass Transit Magazine. Retrieved 17 May 2016.
  32. 1 2 "Peninsula Corridor Electrification - Fact Sheet" (PDF). Caltrain. February 2013. Retrieved October 26, 2013.
  33. "Caltrain approves FY 2017 operating and capital budgets". Railway Age. 3 June 2016. Retrieved 5 June 2016.
  34. "Electrification Notice of Preparation". Caltrain.
  35. "Caltrain Electrification Status Report, April 2006 Board Meeting" (MS PowerPoint). Caltrain. April 2006.
  36. Meacham, Jody (4 March 2016). "Caltrain CEO denies report that electrification project faces possible delay". American City Business Journals. Silicon Valley Business Journal. Retrieved 17 May 2016.
  37. "Advanced Signal System Installation Fact Sheet" (PDF). Caltrain. May 2015. Retrieved 26 May 2015.
  38. "Hotline #656". National Association of Railroad Passengers. May 28, 2010. Retrieved June 11, 2010.
  39. Rosenburg, Mike (May 27, 2010). "Electric train granted key waiver". San Jose Mercury News. Retrieved December 6, 2014.
  40. 1 2 "Caltrain/California HSR Blended Operations Analysis" (PDF). Caltrain.com. LTK Engineering Services. Retrieved 13 November 2016.
  41. "Caltrain System Map". Caltrain. Retrieved February 11, 2013.
  42. Van Hattem, Matt (July 5, 2006). "Caltrain". Trains Magazine. Retrieved November 22, 2008.
  43. 1 2 "Caltrain To Roll Out Six-Car Trains Beginning Monday, May 11". Caltrain. Caltrain. May 6, 2015. Retrieved May 11, 2015.
  44. "Caltrain Facilities and Statistics". Caltrain. Archived from the original on June 15, 2008. Retrieved November 22, 2008.
  45. Google Earth images.
  46. "Caltrain Set to Open New $140M Maintenance Facility". Caltrain. September 24, 2007. Retrieved April 9, 2008.
  47. "CEMOF Grand Opening". San Jose Mercury News. September 29, 2007. Retrieved April 9, 2008.
  48. "CEMOF: Centralized Equipment, Maintenance and Operations Facility: Fact Sheet". Caltrain. Archived from the original on October 19, 2007. Retrieved January 26, 2008.
  49. "Ridership". Caltrain. Retrieved May 21, 2012.
  50. Caltrain Board Reviews Annual Budget And Ridership Numbers
  51. "2016 Annual Passenger Counts" (PDF). Caltrain. Retrieved 26 October 2016.
  52. "Caltrain sets ridership record". Railway Age. August 25, 2015. Retrieved August 25, 2015.
  53. May 28, 2014, 6:57am PDT Updated: May 29, 2014, 1:00pm PDT, Younger and wealthier, Caltrain riders opt out of traffic, http://www.bizjournals.com/sanjose/news/2014/05/28/younger-and-wealthier-caltrain-riders-opt-out-of.html?page=all
  54. Caltrain Ridership Hits Historic High, August 2, 2012 ,http://www.caltrain.com/about/News_Archive/Caltrain_Ridership_Hits_Historic_High.html
  55. 1 2 How to Ride Step 3 - Pay
  56. 1 2 3 Caltrain: Ticket Vending Machine
  57. 1 2 Clipper
  58. Questions about using Clipper® on Caltrain
  59. "Fare Chart". http://caltrain.com. February 1, 2016. Retrieved March 24, 2016. External link in |publisher= (help)
  60. Batey, Eve (August 3, 2009). "TransLink's Next Stop: Caltrain, August 17: News". SFAppeal. Retrieved November 30, 2011.
  61. 1 2 Vavrinek, Trine, Day & Co., LLP (8 October 2004). Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2004 (Report). Peninsula Corridor Joint Powers Board. p. 11. Retrieved 21 July 2016.
  62. Vavrinek, Trine, Day & Co., LLP (21 October 2005). Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2005 (Report). Peninsula Corridor Joint Powers Board. p. 13. Retrieved 21 July 2016.
  63. Vavrinek, Trine, Day & Co., LLP (13 October 2006). Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2006 (Report). Peninsula Corridor Joint Powers Board. p. 12. Retrieved 21 July 2016.
  64. Vavrinek, Trine, Day & Co., LLP (30 November 2007). Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2007 (Report). Peninsula Corridor Joint Powers Board. p. 12. Retrieved 21 July 2016.
  65. Vavrinek, Trine, Day & Co., LLP (30 November 2008). Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2008 (Report). Peninsula Corridor Joint Powers Board. p. 13. Retrieved 21 July 2016.
  66. Vavrinek, Trine, Day & Co., LLP (30 November 2009). Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2009 (Report). Peninsula Corridor Joint Powers Board. p. 13. Retrieved 21 July 2016.
  67. Maze & Associates (15 October 2010). Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2010 (Report). Peninsula Corridor Joint Powers Board. p. 14. Retrieved 21 July 2016.
  68. 1 2 Maze & Associates (19 October 2011). Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2011 (Report). Peninsula Corridor Joint Powers Board. p. 14. Retrieved 21 July 2016.
  69. 1 2 Maze & Associates (23 October 2012). Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2012 (Report). Peninsula Corridor Joint Powers Board. p. 14. Retrieved 21 July 2016.
  70. 1 2 Maze & Associates (4 October 2013). Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2013 and 2012 (PDF) (Report). Peninsula Corridor Joint Powers Board. p. 16. Retrieved 21 July 2016.
  71. Maze & Associates (16 December 2014). Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2014 and 2013 (PDF) (Report). Peninsula Corridor Joint Powers Board. p. 14. Retrieved 21 July 2016.
  72. Vavrinek, Trine, Day & Co., LLP (15 January 2016). Comprehensive Annual Financial Report For the Fiscal Year Ended June 30, 2015 with Comparative Totals for 2014 (PDF) (Report). Peninsula Corridor Joint Powers Board. p. 13. Retrieved 21 July 2016.
  73. "Caltrain Raises Farebox Recovery Range". Caltrain (Press release). Peninsula Corridor Joint Powers Board. 10 January 2013. Retrieved 22 July 2016.
  74. Porter, Jon (15 May 1982). "JPBX 3187". Railpictures. Retrieved 5 July 2016.
  75. 1 2 "Bikes on Bombardiers". Caltrain. 4 April 2016. Retrieved 5 July 2016.
  76. Middleton, William D. (April 1, 2002). "Transit, the San Francisco treat: with $10.2 billion in projects on the drawing board, rail transit expansion continues at a rapid pace in the San Francisco region". Railway Age   via HighBeam Research (subscription required) . Retrieved 2013-03-03.
  77. Comprehensive Annual Financial Report for the Fiscal Year Ended June 30, 2005 (Report). Peninsula Corridor Joint Powers Board. 2005. Retrieved 3 July 2016. In July 2005, the PCJPB Board of Directors authorized the retirement and sale of twelve 1952 Budd passenger trailers, two 1952 Budd cab control cars and one lot of spare parts. When the PCJPB acquired this equipment in 2000, it was subject to a 1982 Safe Harbor Lease pursuant to Internal Revenue Code Section 168(f)(8). The PCJPB sold this equipment to Grand Canyon Railway, Inc. of Flagstaff, Arizona for $604,000. The PCJPB incurred sale costs of $112,657, the majority of which went towards fulfilling its obligations under the Safe Harbor Lease and towards minimizing any related potential liabilities
  78. Keller, Matt (11 May 2015). "Caltrain adds 6th car to 4 Bombardier trains". ABC 7 News. Retrieved 29 August 2016. The new cars are easy to spot. They have navy blue paint on a white background standing out next to the red and grey cars.
  79. "Caltrain Moves Forward With New Rail Car Purchase". Peninsula Corridor Joint Powers Board. 2014-12-04. Retrieved 2015-01-31.
  80. "KISS Double-Decker Electric Multiple Unit EMU for Peninsula Corridor Joint Powers Board (CALTRAIN), California, USA" (PDF). Retrieved 16 October 2016.
  81. Vantuono, William C. (16 August 2016). "For Caltrain, 16 KISSes from Stadler (but no FLIRTs)". Railway Age. Retrieved 16 October 2016.
  82. "Stadler wins big contract for Caltrain bilevel EMUs". Trains Magazine. 16 August 2016. Retrieved 16 October 2016.
  83. 1 2 "Rider Information > Destinations > Airports". Caltrain. October 28, 2014. Retrieved December 6, 2014.
  84. accountablevta (June 7, 2007). "VTA Watch: BART plans to screw Caltrain connection to SFO". Vtawatch.blogspot.com. Retrieved November 30, 2011.
  85. 1 2 3 4 "Caltrain to Increase Bike Capacity on Trains" (Press release). Joint Powers Board. 6 February 2009. Retrieved 5 July 2016.
  86. "Ridership" (PDF). Caltrain. Retrieved July 15, 2015.
  87. "Bicycle General Info". Caltrain. April 9, 2015. Retrieved May 11, 2015.
  88. "Bicycle Tags". Bicycle Tags. Caltrain. July 16, 2013. Retrieved May 11, 2015.
  89. "Bicyclists can't get on board". Mountain View Voice. July 16, 2004.
  90. 1 2 Simon, Mark (5 May 2009). "Caltrain Bicycle Service May Update - May 5, 2009" (Press release). Caltrain. Retrieved 5 July 2016. That means 36 of our daily 98 trains are scheduled to have two bike cars – many of them in the peak commute hours.
    Many of you have written to ask a series of questions about this new effort: Why can’t we provide two bike cars on every train? Why can’t we provide two bike cars on my train? Why can’t we provide two bike cars on the most heavily used trains? Why is there only one bike car on trains that are supposed to have two bike cars?
    The simplest answer to most of these questions is that we don’t have enough bike cars to put two on every train, or even on every peak train, and, in doing all we can to expand service for our cycling customers, we have to be mindful of the impact of these changes on our entire system and all of our customers, particularly on on-time performance.
    All of our cars, not just our bike cars, serve our entire schedule throughout our entire day, which means they rotate through the schedule, and also must be rotated out of service for fueling, washing, maintenance and federally mandated safety and operational inspections.
    A train set that starts its day in San Jose may finish its day in Millbrae and be cycled to San Francisco for its daily maintenance and to begin the next day at the San Francisco station.
    Because of this rotation – because of the demands of our entire service schedule – we can’t guarantee that a specific stop on the schedule will have a specific train.
  91. 1 2 "Caltrain Now Has Two Bike Cars on Every Train". CalTrain. June 1, 2011. Retrieved December 2, 2013.
  92. 1 2 "Caltrain Bike FAQ". Caltrain. Retrieved April 9, 2008.
  93. Kristina Peterson (February 23, 2007). "A safe place for bikes". Palo Alto Daily News. Archived from the original on May 23, 2007. Retrieved February 25, 2007.
  94. "Bicycle Parking". 8 September 2015. Retrieved 5 July 2016.
  95. 1 2 Bartholomew, Tasha (14 May 2015). "Bikes on Caltrain: Leading the nation in bringing bikes onboard". Peninsula Moves (Caltrain blog). Retrieved 14 July 2016.
  96. 1 2 3 Simon, Mark (1 August 2009). "Caltrain Bicycle Service August Update - August 1, 2009" (Press release). Caltrain. Retrieved 5 July 2016.
  97. "Bicycles". Caltrain.com. December 1, 2011. Retrieved December 1, 2011.
  98. Weigel, Samantha (13 January 2015). "Caltrain to make more bike room: Transit agency to refurbish new rail cars for additional bicyclists". San Mateo Daily Journal. Retrieved 5 April 2015.
  99. "Peninsula Corridor JPB Caltrain Rail Transportation Group Generation II Cars Update" (PDF). Caltrain. Bicycle Advisory Committee. 21 January 2016. Retrieved 10 March 2016.

External links

Wikimedia Commons has media related to Caltrain.
This article is issued from Wikipedia - version of the 12/1/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.